Tight underneath
soffit.
Vertical trim will
sit slightly inside
vertical door trim.
Horizontal pcs.1st.
Latch Slant Bolt.
Stemmed Assembly.
Interior Knob.
Strike Plate.
Interior Knob.
Inside Door
.
104.
Position
4AL - Transom Window
Trim
around window, doing a dry run first.
Attach with as per
Step 103
with
4 - 1 1/2” Finishing Nails
per large piece
and
2 - 1 1/2” Finishing Nails
per short
piece. Complete other side window.
Hardware
N1 - 1 1/2” Finishing Nails
x 24 total
Parts
4AL
- Transom Window Trim
(1 Top piece - 41” angle ends)
x 2
(2 Side pieces - 10 5/8” sq.cut)
x 2
(1 Bottom piece - 40” sq.cut)
x 2
105.
Position
4AM - Center Transom Window Trim
around
window doing a dry run first. Attach horizontal trim first and
then the verticals with
4 - 1 1/2” Finishing Nails
per piece.
Hardware
N1 - 1 1/2” Finishing Nails
x 16 total
Parts
4AM
- Center Transom Window Trim
(Top & Bottom pieces - 35 3/4” sq. cut)
x 2
(Side pieces - 20 1/2” sq.cut)
x 2
106.
Locate Door Knob Package. Included in the package will be the
Stemmed Assembly
,
Interior
Knob, Latch Slant Bolt, Strike Plate
and
Screws
(Phillips Head Screw Driver Required). Insert Latch
with Slant Bolt facing to the interior of the shed. Install Stemmed Assembly. Install Interior Knob with
screws (Robertson Screw Driver may be required). Install Strike Plate on Door Casing.Open and close
door and make any adjustments necessary.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 49