background image

Toll Free 1-888-658-1658              www.outdoorlivingtoday.com          [email protected]

Page 13

22.

Locate Top and Bottom

Transom Sash pieces. Starting
with Top Sash, position in 
window cavity framing. Attach
with 

6 - 1 1/2” Finishing Nails

.

Hardware (Steps 22 - 23)

N1 - 1 1/2” Finishing Nails

x 54 total

Parts (Steps 22 - 23)

3D - Straight Cut Top/Bottom Sash 

(1/2” x 2 7/8” x 35 1/4”) 

x 2 /window

3E - Straight Cut Side Sash 

(1/2” x 2 7/8” x 9 1/4”) 

x 2 /window

23.

Complete attachments of bottom and side sash pieces in transom window cavities. Use 

3 - 1 1/2”

Finishing Nails

for side sash pieces. Make sure sash pieces do not protrude past siding as trim will cover

sash and needs a flat surface to attach to.

Содержание STU128

Страница 1: ...ce period All structures purchased from Outdoor Living Today are covered for a period of one year for defects in manufacturing and workmanship Costs incurred for customer installations are not include...

Страница 2: ...8 x 29 1 8 Straight Cut Ledge 1 window Transom Window Sash 3D 6 1 2 x 2 7 8 x 35 1 4 Straight Cut Top Bottom Sash 2 window 3E 6 1 2 x 2 7 8 x 9 1 4 Straight Cut Side Sash 2 window Corner Trim Moulded...

Страница 3: ...vingtoday com sales outdoorlivingtoday com Page 3 1 8 Drill Bit 1 1 2 Finishing 12X8 Studio Interior Wall Kit HARDWARE PACKAGE Optional Materials and Tools Not Included in Kit Materials to Insulate Sh...

Страница 4: ...Right Side Angled 1 pc Part 2L Bottom Side Wall Panel Rear Right Side 1 pc Part 2K Bottom Side Wall Panel Rear Left Side 1 pc Part 2K Top Side Wall Panel Rear Left Side Angled 1 pc Part 2L Top Side W...

Страница 5: ...uare Drive Screw Bit in the Hardware Kit Bag Parts 1A Center Ceiling Panel 3 8 x 47 3 4 x 92 1 2 x 1 Hardware S2 1 1 4 Screws x 10 total 2 Lift Left Right Ceiling Panels up positioning evenly on rafte...

Страница 6: ...on and attach Bottom Rear Wall Panel against cleat Plywood extends past siding on left side Attach with 4 1 1 4 Screws per piece 1 screw per corner Parts 2B Bottom Rear Wall Panel 42 3 4 w x 44 1 2 h...

Страница 7: ...Screws x 4 total 7 Position and attach Top Rear Wall Panel against cleat Plywood extends past siding on right side Attach with 4 1 1 4 Screws per piece 1 screw per corner Parts 2C Top Rear Wall Panel...

Страница 8: ...Center Wall Panel 45 1 4 w x 40 1 4 h x 1 Hardware S2 1 1 4 Screws x 4 total Pre drill siding with 1 8 drill bit Completed rear walls 10 Position and attach Large Window Wall Panel against wall studs...

Страница 9: ...l Panel in left top corner Plywood extends past siding on left side Siding will overhange window wall siding on bottom Attach with 4 1 1 4 Screws per piece Parts 2G Transom Window Wall Panel 46 1 2 w...

Страница 10: ...n and attach Bottom Right Side Wall Panel in front corner Panel will slide in between window panel in corner Attach with 4 1 1 4 Screws per piece Parts 2I Bottom Right Side Wall Panel Front 45 1 4 w x...

Страница 11: ...Side Wall Panel Angled in rear corner Panel will slide in between window panel in corner Attach with 4 1 1 4 Screws per piece Parts 2L Top Right Side Wall Panel Angle Rear 44 7 8 w x 49 h x 1 Hardware...

Страница 12: ...ttach both Straight Cut Vertical Sash pieces in cavity with 6 1 1 2 Finishing Nails per piece Finally position ledge between vertical sash pieces and attach with 6 1 1 2 Finishing Nails Ledge will pro...

Страница 13: ...re Steps 22 23 N1 1 1 2 Finishing Nails x 54 total Parts Steps 22 23 3D Straight Cut Top Bottom Sash 1 2 x 2 7 8 x 35 1 4 x 2 window 3E Straight Cut Side Sash 1 2 x 2 7 8 x 9 1 4 x 2 window 23 Complet...

Страница 14: ...nded Trim 70 Straight Cut x 2 3H Front Corner Rounded Trim 32 with 11 deg cut one end x 2 25 Locate all Horizontal Wall Trim Starting with sides attach against plywood ceiling and wall with 6 1 1 2 Fi...

Страница 15: ...ight Cut x 2 27 Position Vertical and Horizontal Door Trims lining up the 45 deg cut ends When in correct location attach with 20 1 1 2 Finishing Nails Do a dry run before attaching Hardware N1 1 1 2...

Страница 16: ...1 2 45 deg ends x 4 30 Position Top Bottom and Side Trims around center transom window When in correct location attach with 16 1 1 2 Finishing Nails Do a dry run before attaching Hardware N1 1 1 2 Fin...

Страница 17: ...On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction The materials contained in this Assembly Manual may be downloaded or copied provided that ALL...

Отзывы: