background image

32.

Place 1st Floor Base Trim between Vertical

Wall Trim. Measure trim and cut to correct
length. Attach with 

4 - 1 1/2” Finishing Nails

.

Complete remaining Floor Base Trims measuring
and cutting each piece.

Hardware

N1 - 1 1/2” Finishing

Nails

x 36 total

Parts

3X - Floor Base Trims 

(1/4” x 1 1/2” x 48” - Straight cut 

- (customer to cut to length) 

x 9

Congratulations on assembling your 12x8 Studio
Garden Shed Interior Wall Kit!

We  value  your  feedback  and
would like to hear back from you
on how well we are doing in the
following areas:

1. Customer Service
2. On Time Shipping
3. Motor Freight Delivery
4. Quality of Materials
5. Assembly Manual
6. Overall Satisfaction.

The materials contained in this
Assembly Manual may be downloaded
or copied provided that ALL copies
retain the copyright and any other 
proprietary notices contained on the
materials. No material may be 
modified, edited or taken out of context
such that its use creates a false or 
misleading statement or impression as
to the positions, statements or actions.

Canadian Address
9393 287th Street
Maple Ridge, British Columbia
Canada     V2W 1L1

United States Address
P.O. Box 96
Sumas, Washington
USA    98295

Outdoor Living Today

Please call, write or email us at: 

Toll Line: 1.888.658.1658         |      Fax: 1.604.462.5333      |      [email protected]

Page 17

Содержание STU128

Страница 1: ...ce period All structures purchased from Outdoor Living Today are covered for a period of one year for defects in manufacturing and workmanship Costs incurred for customer installations are not include...

Страница 2: ...8 x 29 1 8 Straight Cut Ledge 1 window Transom Window Sash 3D 6 1 2 x 2 7 8 x 35 1 4 Straight Cut Top Bottom Sash 2 window 3E 6 1 2 x 2 7 8 x 9 1 4 Straight Cut Side Sash 2 window Corner Trim Moulded...

Страница 3: ...vingtoday com sales outdoorlivingtoday com Page 3 1 8 Drill Bit 1 1 2 Finishing 12X8 Studio Interior Wall Kit HARDWARE PACKAGE Optional Materials and Tools Not Included in Kit Materials to Insulate Sh...

Страница 4: ...Right Side Angled 1 pc Part 2L Bottom Side Wall Panel Rear Right Side 1 pc Part 2K Bottom Side Wall Panel Rear Left Side 1 pc Part 2K Top Side Wall Panel Rear Left Side Angled 1 pc Part 2L Top Side W...

Страница 5: ...uare Drive Screw Bit in the Hardware Kit Bag Parts 1A Center Ceiling Panel 3 8 x 47 3 4 x 92 1 2 x 1 Hardware S2 1 1 4 Screws x 10 total 2 Lift Left Right Ceiling Panels up positioning evenly on rafte...

Страница 6: ...on and attach Bottom Rear Wall Panel against cleat Plywood extends past siding on left side Attach with 4 1 1 4 Screws per piece 1 screw per corner Parts 2B Bottom Rear Wall Panel 42 3 4 w x 44 1 2 h...

Страница 7: ...Screws x 4 total 7 Position and attach Top Rear Wall Panel against cleat Plywood extends past siding on right side Attach with 4 1 1 4 Screws per piece 1 screw per corner Parts 2C Top Rear Wall Panel...

Страница 8: ...Center Wall Panel 45 1 4 w x 40 1 4 h x 1 Hardware S2 1 1 4 Screws x 4 total Pre drill siding with 1 8 drill bit Completed rear walls 10 Position and attach Large Window Wall Panel against wall studs...

Страница 9: ...l Panel in left top corner Plywood extends past siding on left side Siding will overhange window wall siding on bottom Attach with 4 1 1 4 Screws per piece Parts 2G Transom Window Wall Panel 46 1 2 w...

Страница 10: ...n and attach Bottom Right Side Wall Panel in front corner Panel will slide in between window panel in corner Attach with 4 1 1 4 Screws per piece Parts 2I Bottom Right Side Wall Panel Front 45 1 4 w x...

Страница 11: ...Side Wall Panel Angled in rear corner Panel will slide in between window panel in corner Attach with 4 1 1 4 Screws per piece Parts 2L Top Right Side Wall Panel Angle Rear 44 7 8 w x 49 h x 1 Hardware...

Страница 12: ...ttach both Straight Cut Vertical Sash pieces in cavity with 6 1 1 2 Finishing Nails per piece Finally position ledge between vertical sash pieces and attach with 6 1 1 2 Finishing Nails Ledge will pro...

Страница 13: ...re Steps 22 23 N1 1 1 2 Finishing Nails x 54 total Parts Steps 22 23 3D Straight Cut Top Bottom Sash 1 2 x 2 7 8 x 35 1 4 x 2 window 3E Straight Cut Side Sash 1 2 x 2 7 8 x 9 1 4 x 2 window 23 Complet...

Страница 14: ...nded Trim 70 Straight Cut x 2 3H Front Corner Rounded Trim 32 with 11 deg cut one end x 2 25 Locate all Horizontal Wall Trim Starting with sides attach against plywood ceiling and wall with 6 1 1 2 Fi...

Страница 15: ...ight Cut x 2 27 Position Vertical and Horizontal Door Trims lining up the 45 deg cut ends When in correct location attach with 20 1 1 2 Finishing Nails Do a dry run before attaching Hardware N1 1 1 2...

Страница 16: ...1 2 45 deg ends x 4 30 Position Top Bottom and Side Trims around center transom window When in correct location attach with 16 1 1 2 Finishing Nails Do a dry run before attaching Hardware N1 1 1 2 Fin...

Страница 17: ...On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction The materials contained in this Assembly Manual may be downloaded or copied provided that ALL...

Отзывы: