background image

2 1/2”

1 1/4”

Square Drive Bit

Hardware Kit 

(Provided)

Safety Glasses

Work Gloves

Safety Equipment Required 

(Not Provided)

Ladders

Screw Gun/Drill

Tape Measure

Hammer

Level

Pliers

Tools Required 

(Not Provided)

Toll Free 1-888-658-1658             www.outdoorlivingtoday.com         [email protected]

Page 3

1/8” Drill Bit

1 1/2” 

Finishing

12X8 Studio Interior Wall Kit HARDWARE PACKAGE

Optional Materials and Tools - Not Included in Kit

Materials to Insulate Shed prior to installing Interior Wall Kit

2” thick Foam Board Insulation  
364 sq ft. (covers walls and ceiling)

96 sq ft additional for floor

6 mm Poly - Air Vapor Barrier -

Tools - 

Staple Gun
Utility Knife
Caulking Gun and Caulking

x 15

x 126

x 430

x 1

Содержание STU128

Страница 1: ...ce period All structures purchased from Outdoor Living Today are covered for a period of one year for defects in manufacturing and workmanship Costs incurred for customer installations are not include...

Страница 2: ...8 x 29 1 8 Straight Cut Ledge 1 window Transom Window Sash 3D 6 1 2 x 2 7 8 x 35 1 4 Straight Cut Top Bottom Sash 2 window 3E 6 1 2 x 2 7 8 x 9 1 4 Straight Cut Side Sash 2 window Corner Trim Moulded...

Страница 3: ...vingtoday com sales outdoorlivingtoday com Page 3 1 8 Drill Bit 1 1 2 Finishing 12X8 Studio Interior Wall Kit HARDWARE PACKAGE Optional Materials and Tools Not Included in Kit Materials to Insulate Sh...

Страница 4: ...Right Side Angled 1 pc Part 2L Bottom Side Wall Panel Rear Right Side 1 pc Part 2K Bottom Side Wall Panel Rear Left Side 1 pc Part 2K Top Side Wall Panel Rear Left Side Angled 1 pc Part 2L Top Side W...

Страница 5: ...uare Drive Screw Bit in the Hardware Kit Bag Parts 1A Center Ceiling Panel 3 8 x 47 3 4 x 92 1 2 x 1 Hardware S2 1 1 4 Screws x 10 total 2 Lift Left Right Ceiling Panels up positioning evenly on rafte...

Страница 6: ...on and attach Bottom Rear Wall Panel against cleat Plywood extends past siding on left side Attach with 4 1 1 4 Screws per piece 1 screw per corner Parts 2B Bottom Rear Wall Panel 42 3 4 w x 44 1 2 h...

Страница 7: ...Screws x 4 total 7 Position and attach Top Rear Wall Panel against cleat Plywood extends past siding on right side Attach with 4 1 1 4 Screws per piece 1 screw per corner Parts 2C Top Rear Wall Panel...

Страница 8: ...Center Wall Panel 45 1 4 w x 40 1 4 h x 1 Hardware S2 1 1 4 Screws x 4 total Pre drill siding with 1 8 drill bit Completed rear walls 10 Position and attach Large Window Wall Panel against wall studs...

Страница 9: ...l Panel in left top corner Plywood extends past siding on left side Siding will overhange window wall siding on bottom Attach with 4 1 1 4 Screws per piece Parts 2G Transom Window Wall Panel 46 1 2 w...

Страница 10: ...n and attach Bottom Right Side Wall Panel in front corner Panel will slide in between window panel in corner Attach with 4 1 1 4 Screws per piece Parts 2I Bottom Right Side Wall Panel Front 45 1 4 w x...

Страница 11: ...Side Wall Panel Angled in rear corner Panel will slide in between window panel in corner Attach with 4 1 1 4 Screws per piece Parts 2L Top Right Side Wall Panel Angle Rear 44 7 8 w x 49 h x 1 Hardware...

Страница 12: ...ttach both Straight Cut Vertical Sash pieces in cavity with 6 1 1 2 Finishing Nails per piece Finally position ledge between vertical sash pieces and attach with 6 1 1 2 Finishing Nails Ledge will pro...

Страница 13: ...re Steps 22 23 N1 1 1 2 Finishing Nails x 54 total Parts Steps 22 23 3D Straight Cut Top Bottom Sash 1 2 x 2 7 8 x 35 1 4 x 2 window 3E Straight Cut Side Sash 1 2 x 2 7 8 x 9 1 4 x 2 window 23 Complet...

Страница 14: ...nded Trim 70 Straight Cut x 2 3H Front Corner Rounded Trim 32 with 11 deg cut one end x 2 25 Locate all Horizontal Wall Trim Starting with sides attach against plywood ceiling and wall with 6 1 1 2 Fi...

Страница 15: ...ight Cut x 2 27 Position Vertical and Horizontal Door Trims lining up the 45 deg cut ends When in correct location attach with 20 1 1 2 Finishing Nails Do a dry run before attaching Hardware N1 1 1 2...

Страница 16: ...1 2 45 deg ends x 4 30 Position Top Bottom and Side Trims around center transom window When in correct location attach with 16 1 1 2 Finishing Nails Do a dry run before attaching Hardware N1 1 1 2 Fin...

Страница 17: ...On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction The materials contained in this Assembly Manual may be downloaded or copied provided that ALL...

Отзывы: