54.
Position and attach 2nd Outside Roof Panel on Rafters as per
Step 52
using
1 - 2 1/2” screw
.
1 - 2 1/2” screw to
secure Front Roof Panel.
Shingles overhang
plywood on Outside
Roof Panel.
Hardware (Step 54)
S1
- 2 1/2” Screws
x 1 total
55.
Repeat
Steps 51 - 54
with remining roof panels to omplete opposite
side of cedar roof. Attach with
4 - 2 1/2” screws
.
Hardware (Step 55)
S1
- 2 1/2” Screws
x 4 total
56.
Roof
Filler Shingles
are included to cover roof
seams. Starting at the bottom, slide the first Long shingle
in until flush with other bottom shingles.
Parts (Steps 56 - 58)
Filler Shingles - Long x 16
Filler Shingles - Short x 4
Hardware (Steps 56 - 58)
S1
- 2 1/2” Screws
x 32 total
N2
- 1 1/2” Shingle Nails
x 8 total
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]