86.
Toe-nail
Short Post
to Deck
with
3 - 2 1/2” Screws
. Drill pilot
holes to avoid splitting posts.
Note:
Ensure the screws are low
enough on the post to be covered by
Post Base Trim in
Step 97
.
PreDrill!
Hardware (Steps 86)
S1
- 2 1/2” Screws
x 3 total
87.
Place 1st
Roof Ridge Cap
on roof peak overhanging shingles by
aprroximatley 1”. Attach with
2 - 1 1/2” Shingle Nails
9” from end. Place
2nd Ridge Cap 1” back from first cap. Attach with
2 - 1 1/2” Shingle
Nails
9” from end. Alternate each Ridge Cap seam as you proceed.
Parts (Steps 87-88)
Roof Ridge Caps x 21
Ridge Cap Short x 1
Hardware (Steps 87-88)
N2
- 1 1/2” Shingle Nails
x 42 total
Alternate Ride Cap seams (offsetting angle cut at peak)
Important:
Butt (thick) end
of Ridge Cap will be facing
towards the outside of shed.
9” from end
Thin End
88.
Place 3rd
Ridge Cap
8” back from 2nd (enough to cover shingle nails). Attach 3rd Ridge Cap as
per
Step 87
. Continue to position and attach Ridge Caps until half the roof is complete. From opposite
side, position and attach Ridge Caps as described above. One Ridge Cap is cut shorter to fit in the cen-
ter of the roof. Attach center cap with
4 - 1 1/2” Shingle Nails
.
8
”
8
”
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 47