59.
Position
4 - 90° Metal Brackets
onto roof plywood and outside Raftter,
secure with
4 - 1 1/4” screws
per bracket. Complete for both inside Gables.
58.
Slide in another
Filler Shingle
and attach as per
Step 57
. On your last row of shingles,
attach smaller
Filler Shingles
with
2 - 1 1/2” Shingle Nails
near the top, to be covered by
Ridge Caps
in
Step 87
. Complete both rows of
Filler Shingles
where roof seams meet in the
same way.
Hardware (Step 59)
S2
- 1 1/4” Screws
x 32 total
Y2 - 90° Metal Bracket
x 8 total
57.
Screw first
Filler Shingle
down to rafters using
2 - 2 1/2” screws
(1 per panel). Make sure to screw
into both rafters.
Attach above the
exposure line.
Exposure Line
Pre-drill Shingle to avoid cracking.
Angle screw slightly into rafter.
Long Filler Shingles
Short Filler Shingles
4 - 90° Metal Brackets / Gable
4 - 1 1/4” screws into
each bracket