50.
Before fully fastening
Metal Roof Panels
down, remove the
Metal
Roof Hangars
and insert
Foam Enclosures
between
Metal Roof
Panels
and
Battens
at the bottom of the roof. Enclosures will prevent
moisture and unwanted bugs, etc from entering your shed through here.
Parts (Step 50)
Foam Enclosures
(Several Pcs)
Important:
Remove Metal
Roof Hangars
51.
Using
12 - 2” Metal Screws
and 1/4” Nut Driver, secure
Metal
Roof Panels
down to lower 2 rows of
Battens
. Leave the top row unse-
cured for now to secure Ridge Cap later in
Step 54
. Tighten screws in
middle row that were partially secured in
Step 54
. Do not overtighten!
Hardware (Step 51)
2” - Metal Roof Screws
x 12
total
Screw into center of
Battens.
52.
Repeat Steps 46 - 51 to compleete opposite side of Metal Roof.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 29