A. Floor Section
Plywood Floor
Large (2)
Floor Joist
Frames (3)
Floor Runners
Short (3)
Floor Runners
Long (3)
Plywood Floor
Small
Exploded view of all parts necessary to complete
Floor Section. Identify all parts prior to starting.
Concrete Pad (optional
foundation method)
Floor
Joist (4)
Outside Frame
to outside Joist
Inside Frame
to Inside Joist
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 5
You can find the
Square Drive Bit for
the screws in with
the Hardware Kit Bag.
Middle of joist to
middle of joist
10 3/4”
13 3/4”
9”
1.
Attach Interior
Floor Joists
to
Floor Joist Frames.
Only
the Center Floor Joist Frame requires 2 Joists to be attached.
Measure and attach both Joists with
2 - 2 1/2” Screws
per
Joist end as illustrated to the right.
Parts (Steps 1 - 3)
Floor Joists
(1 1/2” x 3 1/2” x 71 7/8”)
x 4
Floor Joist Frames
(35” x 75”)
x 3
Hardware (Steps 1 - 3)
S1
- 2 1/2” Screws
x 28 total