Soffit
35.
Third batten row should be positioned approximately 3.5” from ridge board when properly
spaced.
36.
Complete attachment of battens to 2nd Rafter Section as per
Steps 29-35.
With both rafter/batten sections complete, carefully lift section up with a helper.
37.
Lift and slide rafter/batten section up
on over the side walls and onto the gable
framing.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 19
3.5”