Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 32
Flush with end
of batten.
67.
Attach
Facia Nailing Strips
to
the underside edge of the roof battens.
Align corner of Nailing Strip with corner
of roof battens. Secure each Strip with
3 - 1 1/4” Screws
. Complete all four
pieces, two on each side of the shed.
Parts
Facia Nailing Strips
(3/4” x 2 1/2” x 44 1/2”)
x 4
Hardware
S2
- 1 1/4” Screws
x 12 total
68.
Attach
Side Facia
to end of roof panel plywood and Nailing
Strip. Line Facia up to form a peak and attach to Nailing Strip/plywood
with
6 - 1 1/2” Finishing Nails
per piece. End of Side Facia should
be aligned flush with Rafter ends. Gap where Facia boards come
together at peak will be covered in
Step 69.
Parts
Side Facia
- Angle Cut Ends
(3/4” x 3 1/2” x 45 7/8”)
x 4
Hardware
N1
- 1 1/2” Finishing Nails
x 24 total
Front Facia caps
Side Facia.