Installation instructions
for the specialist company
EPANA 6 kW
EN
2.8 Electrical connection
Fig. 2.11 Electrical connection diagram
2.9 Checking the installation and function
●
Check the fully completed installation (visual inspection)!
●
Switch the pellet fireplace on and check all of the functions, and
check the chimney flue for leaks! Carry out initial commissioning!
2.10 Initial commissioning by the specialist company
●
Please ensure that no objects made from flammable materials are loca-
ted or placed in the radiation range of the fireplace (See chapter 2.6)!
●
Before heating for the first time, check that all accessories have
been removed from the ash pan and combustion chamber!
Open the firebox door and pull out the ash box to the front!
●
Remove the protective film from the touch control panel!
●
Convection air openings may not be covered!
●
The precautions for the combustion air supply may not be mo-
dified. In particular, care must be taken to ensure that the ne-
cessary combustion air lines are open during operation of the
fireplace!
●
Plug the shockproof plug into a 230 V/50 Hz shockproof socket.
●
Fill the pellet reservoir with pellets (see chap. 3.2)!
●
During initial commissioning, or after the reservoir has run
empty, a handful of pellets must be poured into the burner
trough towards the igniter. Otherwise, only the pellet duct will be
filled within the filling period in the start phase and only an insuf-
ficient pellets will fall into the burner trough.