Issue 02 (2019-07-17)
29
BRE-I-5K14K
User Manual
5 Electrical Connections
Step 2:
Insert the communication connector into the communication interface of the four battery packs by
number
.
Figure 5-5
Communication cable
installation
Step 3:
Please connect the PE cable, as shown (Figure 5-6), to ensure that all battery packs are well-
grounded.
Figure 5-6 PE
cable installation
Содержание BRE-I-5K14K
Страница 1: ...User Manual BRE I 5K14K OLIPOWER ENERGY AUTOMATION TECHNOLOGY...
Страница 41: ...Issue 02 2019 07 17 38 BRE I 5K14K User Manual 5 Electrical Connections Figure 5 15 Installing the Com cable...
Страница 68: ...Issue 02 2019 07 17 65 BRE I 5K14K User Manual 6 System Commissioning...
Страница 73: ...Issue 02 2019 07 17 70 BRE I 5K14K User anual 8 Technical Specification 8 6 Dimension...