Issue 02 (2019-07-17)
22
BRE-I-5K14K
User Manual
4 System
Step 4:
Place the battery pack in the battery compartment by number 1~4.
Figure 4-8
Install the battery pack
(1) Install 1# battery pack
(2) Install 2# battery pack
(3) Install 3# battery pack
(4) Install 4# battery pack
4.5.2
Main control installation
Step 1:
Make sure the main control box is firmly fixed to the wall.
Figure 4-9
Mounting
main control box
2
1
3
4