Issue 02 (2019-07-17)
40
BRE-I-5K14K
User Manual
6 System Commissioning
6
System Commissioning
6.1
Checking Before Power-On
Table 6-1
Installation checklist
No.
Check Item
Acceptance Criteria
1
BRE-I-5K14K installation
The BRE-I-5K14K is installed
correctly, securely, and reliably.
3
Cable layout
Cables are correctly routed as required by
the customer.
4
Cable tie
Cable ties are secured evenly, and no
burr exists.
5
Grounding
The ground cable is connected correctly,
securely, and reliably.
6
DC switch
The DC switch and all the switches
connecting to the BRE-I-5K14K are
OFF.
7
Cable connections
The AC output power cable, DC input power
cable, battery cable, and signal cable are
connected correctly, securely, and reliably.
8
Unused terminals and ports
Watertight caps lock unused terminals
and ports.
9
Installation environment
The installation space is proper, and the
installation environment is clean and tidy,
without a foreign matter.
Содержание BRE-I-5K14K
Страница 1: ...User Manual BRE I 5K14K OLIPOWER ENERGY AUTOMATION TECHNOLOGY...
Страница 41: ...Issue 02 2019 07 17 38 BRE I 5K14K User Manual 5 Electrical Connections Figure 5 15 Installing the Com cable...
Страница 68: ...Issue 02 2019 07 17 65 BRE I 5K14K User Manual 6 System Commissioning...
Страница 73: ...Issue 02 2019 07 17 70 BRE I 5K14K User anual 8 Technical Specification 8 6 Dimension...