background image

BOH-PM-07-4 

 

 

 

 

 

 

 

© 2016 BOH Environmental LLC 

Chapter 4 Rev. 7.01 

 

 
 
 
 
 
 
 
 

FPU

®

 SYSTEMS OPERATION MANUAL 

(INCLUDING REPAIR PARTS & SPECIAL TOOL LIST)

 

MODELS FPU-8-4/BOH-CARGO-12-3 & FPU-20-3 

BOH FPU Field Pack-up Units 

 
 
 
 
 
 
 
 
 
 
 

CHAPTER 4 

 

OPERATOR MAINTENANCE INSTRUCTIONS 

 

Содержание BOH-CARGO-12-3

Страница 1: ...H Environmental LLC Chapter 4 Rev 7 01 FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST MODELS FPU 8 4 BOH CARGO 12 3 FPU 20 3 BOH FPU Field Pack up Units CHAPTER 4 OPERATOR MAINT...

Страница 2: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Страница 3: ...interval Perform all checks and services keeping in mind the following guidelines Before you begin using the FPU SYSTEM perform Before Operation PMCS checks and services While the FPU SYSTEM is in use...

Страница 4: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Страница 5: ...alt Clean as required Check Horizontal Interconnectors for proper function tightness and debris Clean as required and replace if not functioning properly Damage or malfunction that would cause the FPU...

Страница 6: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Страница 7: ...covered when cleaning and or lubricating that cannot be corrected using the troubleshooting procedures described in WP 0011 00 should be reported to maintenance for corrective action Table 1 Cleaning...

Страница 8: ...thly or as required if under adverse conditions Door Lock Shaft Pivot Bearing Molykote Multipurpose Synthetic Grease P N 26040124 As Required All Temperatures Monthly or as required if under adverse c...

Страница 9: ...bricate P N 26040123 As Required All Temperatures Monthly or as Required if Under adverse conditions Vertical Rack Stanchion Recessed Rings FPU 8 4 BOH CARGO 12 3 only General Purpose Lubricating Oil...

Страница 10: ...As Required All Temperatures Monthly or as Required if under Adverse Conditions FPU SYSTEM Module Drawer Slam Locks Molykote Multipurpose Synthetic Grease P N 26040124 As Required All Temperatures Mo...

Страница 11: ...dder with hand rail INSPECT 1 Open and close right door A left door B refer to chapter 2 pages 0006 00 9 and 00 10 to ensure proper operation and alignment 2 Visually inspect door seals for damage 3 I...

Страница 12: ...door B slightly when closed to prevent damage to the door edge seals 4 Notify maintenance of any missing or damaged seals and any problems with operation of latch handle or hinges for service 5 Notify...

Страница 13: ...el Parts References None Chapter 2 WP 0005 00 2 and 00 3 Personnel Required Equipment Condition One FPU SYSTEMS Set up INSPECT 1 Raise and lower each of the steps 2 to ensure they stow and operate pro...

Страница 14: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Страница 15: ...WP 0006 00 11 to 00 16 Personnel Required Equipment Condition One FPU SYSTEM Set up INSPECT 1 Inspect the vertical rack frame 1 for cracks excessive dents or bending Report to maintenance for repair...

Страница 16: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Страница 17: ...to 00 18 Personnel Required Equipment Condition One FPU SYSTEMS Set up INSPECT 1 Inspect pallet 1 for cracks excessive dents or sagging report damage to maintenance for repair or replacement 2 Inspec...

Страница 18: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Страница 19: ...IAL SETUP Materiel Parts References None Chapter 2 WP 0006 00 17 Personnel Required Equipment Condition One FPU SYSTEMS Set up INSPECT 1 Remove pallet from container using a forklift 2 Inspect pallet...

Страница 20: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Отзывы: