background image

 

 

0013 00 

 

      
BOH-PM-07-4 
Chapter 4 Rev. 7.01 

0013 00-1 

OPERATOR MAINTENANCE INSTRUCTIONS 

 

FPU

®

 SYSTEMS OPERATION MANUAL 

(INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) 

MODELS FPU-8-4/BOH-CARGO-12-3 & FPU-20-3 

BOH FPU Field Pack-up Units 

 

PMCS TABLE 

 

 

INITIAL SETUP: 
Materiel/Parts 

References 

Rags, Water 

None 

Personnel Required 

Equipment Condition 

One 

FPU SYSTEMS Set-up 

 

Table 1 Preventative Maintenance Checks and Services for the FPU SYSTEMS 

PMCS B (Before), D (During), A (After), W (Weekly), M (Monthly) 

 

 

B  D  A  W  M 

Inspection Item and Procedure 

Equipment Not 

Ready/Available If 

 

 

Doors, Walls 

Check all doors and walls for cracks, dents, 
holes, or loose/missing hardware. 

Missing doors, punctures, 
damage that would cause 
hazard or injury. 

 

 

 

 

 

Lubricate hinges, locks, as required. 

Hinges and locks do not 
operate smoothly. 

 

 

 

Exterior 

Check all exterior surfaces for cracks, dents that 
effect the operation of the FPU SYSTEM or its 
modules.  Check for accumulations of dirt, debris, 
ice, snow, or salt.  Clean as required. 
Check Horizontal Interconnectors for proper 
function, tightness and debris.  Clean as required 
and replace if not functioning properly. 

Damage or malfunction that 
would cause the FPU 
SYSTEM from operating 
properly such as Horizontal 
Interconnectors not 
tightening properly which can 
cause hazard or injury. 

 

 

 

Interior 

Check floor for dirt and debris.  Clean with broom 
or rags as required.  Check module cradles in 
FPU SYSTEM floor for cracks or missing\rubber 
pads.  Schedule cracked cradles for repair.  
Check center ISO locks for cracks or missing 
items.  Check module-locking levers for missing 
or loose cotter pins.  Replace or tighten as 
necessary. 
Check roof access steps for cracks or missing 
components.  Replace as necessary.

 

Module cradles missing or 
damaged so that module 
does not seat properly, 
center ISO twist locks are 
broken or missing or roof 
access steps cracked or 
missing which can cause 
hazard or injury. 

 

 

 

Data Plates 

Check plates for legibility, damage and/or 
missing.  Clean with water and rag.  Replace as 
needed. 

ISO/CSC Safety Data plates 
must be replaced if missing 
or system will be non-
deployable. 

 

END OF WORK PACKAGE

 

Содержание BOH-CARGO-12-3

Страница 1: ...H Environmental LLC Chapter 4 Rev 7 01 FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST MODELS FPU 8 4 BOH CARGO 12 3 FPU 20 3 BOH FPU Field Pack up Units CHAPTER 4 OPERATOR MAINT...

Страница 2: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Страница 3: ...interval Perform all checks and services keeping in mind the following guidelines Before you begin using the FPU SYSTEM perform Before Operation PMCS checks and services While the FPU SYSTEM is in use...

Страница 4: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Страница 5: ...alt Clean as required Check Horizontal Interconnectors for proper function tightness and debris Clean as required and replace if not functioning properly Damage or malfunction that would cause the FPU...

Страница 6: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Страница 7: ...covered when cleaning and or lubricating that cannot be corrected using the troubleshooting procedures described in WP 0011 00 should be reported to maintenance for corrective action Table 1 Cleaning...

Страница 8: ...thly or as required if under adverse conditions Door Lock Shaft Pivot Bearing Molykote Multipurpose Synthetic Grease P N 26040124 As Required All Temperatures Monthly or as required if under adverse c...

Страница 9: ...bricate P N 26040123 As Required All Temperatures Monthly or as Required if Under adverse conditions Vertical Rack Stanchion Recessed Rings FPU 8 4 BOH CARGO 12 3 only General Purpose Lubricating Oil...

Страница 10: ...As Required All Temperatures Monthly or as Required if under Adverse Conditions FPU SYSTEM Module Drawer Slam Locks Molykote Multipurpose Synthetic Grease P N 26040124 As Required All Temperatures Mo...

Страница 11: ...dder with hand rail INSPECT 1 Open and close right door A left door B refer to chapter 2 pages 0006 00 9 and 00 10 to ensure proper operation and alignment 2 Visually inspect door seals for damage 3 I...

Страница 12: ...door B slightly when closed to prevent damage to the door edge seals 4 Notify maintenance of any missing or damaged seals and any problems with operation of latch handle or hinges for service 5 Notify...

Страница 13: ...el Parts References None Chapter 2 WP 0005 00 2 and 00 3 Personnel Required Equipment Condition One FPU SYSTEMS Set up INSPECT 1 Raise and lower each of the steps 2 to ensure they stow and operate pro...

Страница 14: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Страница 15: ...WP 0006 00 11 to 00 16 Personnel Required Equipment Condition One FPU SYSTEM Set up INSPECT 1 Inspect the vertical rack frame 1 for cracks excessive dents or bending Report to maintenance for repair...

Страница 16: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Страница 17: ...to 00 18 Personnel Required Equipment Condition One FPU SYSTEMS Set up INSPECT 1 Inspect pallet 1 for cracks excessive dents or sagging report damage to maintenance for repair or replacement 2 Inspec...

Страница 18: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Страница 19: ...IAL SETUP Materiel Parts References None Chapter 2 WP 0006 00 17 Personnel Required Equipment Condition One FPU SYSTEMS Set up INSPECT 1 Remove pallet from container using a forklift 2 Inspect pallet...

Страница 20: ...BOH PM 07 4 Chapter 4 Rev 7 01 This page was intentionally left blank...

Отзывы: