10
20039847GB
5.2. Oil
Pumps
For KP-6, KP-6 L, KP-6-2 burners
Danfoss BFP 21 L3
Suntec AS 47 C
1
Suction line connection
2
Return line connection
3
Nozzle connection
4
Pressure gauge connection
5
Vacuum meter connection
6
Pressure regulation
7
Air venting nipple/plug
8
By-pass plug
9
Filter
10
Solenoid valve, NC
1
Suction line connection
2
Return line connection
3
Nozzle connection
4
Pressure gauge connection
5
Vacuum meter connection
6
Pressure regulation
7
Air venting plug
8
By-pass plug
9
Filter
10
Solenoid valve, NO
Oil pump venting
Two-pipe system needs no venting as the air comes away when starting the burner. In order to
speed up the air removal, the air venting plug or the pressure gauge connection (4) can be
loosened.
Oil supply to the burner can be noted on the oil pressure gauge fixed to the oil pump or on the oil
spray from the nozzle.
Содержание KP-6
Страница 7: ...5 20039847GB 3 3 Basic Assembly Drawing...