Ohio Medical Corporation, 1111 Lakeside Drive, Gurnee, Il 60031-4099 (800)662-5822—Fax: (847) 855-6218
www.ohiomedical.com —– 550107 (Rev.5) 08/2005
9
procedure should be performed.
1.
Remove the pump assembly from the Moblvac III-cs as described above in the PUMP
REPLACEMENT
section.
2.
.Remove the three (3) pump head screws located on the pump head.
3.
Remove the cover plate, shim, wear plate and the four (4) vanes.
4.
Wash all exposed areas with an isopropyl alcohol solution.
Before you reassemble the pump make certain that all components are completely dry. Rust is likely
to form if any moisture is present.
5.
Replace the vanes, wear plate, shim, and cover plate.
6.
Replace and equally tighten the three (3) pump head screws.
7.
Reinstall the pump assembly.
3. PERFORMANCE TEST AND ADJUSTMENT
It is recommended that you verify performance or the Moblvac III-cs after:
-
An
overflow.
-
Preventative
maintenance.
-
Any
maintenance.
To verify pump & regulator operation:
1.
Plug the power cord into an electrical outlet. Turn the unit ON and listen to verify that the
pump starts.
2.
Open the vacuum port located at the top of the backpole assembly and place your finger over
the outlet.
3.
Adjust the vacuum level by turning the vacuum regulator knob. Verify that the vacuum gauge
reflects a change in vacuum level while turning the regulator knob. Also verify that you feel
vacuum at your finger tip.
4.
Turn the unit OFF.
The following steps will verify the flow and the vacuum specifications:
1.
Connect a suction flow measuring device to the vacuum outlet of the Moblvac
®
III-cs.
2.
Turn the unit
ON
.