![OHAUS MB25 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/ohaus/mb25/mb25_service-manual_3594574026.webp)
CHAPTER 3 MAINTENANCE PROCEDURES
MB23 and MB25 Service Manual
3-7
Ohaus Corporation www.ohaus.com
3.7 REPLACING THE LOAD CELL
1. Open the Housing as in Section 3.2; remove the Load Cell Cover, as in Section 3-3.
2. Remove the ribbon cable that
connects the two PCBs.
(Figure 3-14.)
3. Remove the four screws that
secure the Load Cell.
4. Carefully lift up the Load Cell
– not
all the way. (See next step.)
5. Hold the Load Cell with one hand
and gently lift out the ribbon cable
from the groove that secures it to
the Bottom Housing.
(See Figure 3-15.)
6. Lift out the Load Cell.
Figure 3-14. Load Cell.
7. Disconnect the ribbon cable from
the old Load Cell, and connect it to
the replacement Load Cell.
8. Install the new Load Cell by
reversing the steps above.
9. Reassemble the Moisture Analyzer.
10. Install the Load Cell, using the
Software Service Tool
. (See
Appendix B.)
11. Calibrate the Moisture Analyzer
(See Appendix A.) and Perform all
tests. (See Chapter 4.)
Figure 3-15. Load Cell with ribbon cable
attached at bottom.
Содержание MB25
Страница 1: ...SERVICE MANUAL Ohaus Corporation 7 Campus Drive Suite 310 Parsippany NJ 07054 USA 973 377 9000...
Страница 2: ......
Страница 4: ......
Страница 8: ...TABLE OF CONTENTS MB23 and MB25 Service Manual iv Ohaus Corporation www ohaus com...
Страница 43: ...CHAPTER 5 PARTS LISTS DIAGRAMS Ohaus Corporation www ohaus com 5 4 MB23 and MB25 Service Manual...
Страница 47: ...APPENDIX A STANDARD CALIBRATION Ohaus Corporation www ohaus com A 4 MB23 and MB25 Service Manual...