CHAPTER 3 MAINTENANCE PROCEDURES
Adven
turer ™ Balances Service Manual 33 Ohaus Corporation www.ohaus.com
4.
Locate and remove the cable connecting the Strain Gage type load cell to the balance main
PCBA as shown below.
Figure 3-34 SG Load cell cable to main PCBA removed.
5.
Locate and remove the 4 screws securing the Strain gage Load Cell to the bottom housing.
Figure 3-35 Location of the 4 screws securing Strain Gage load cell to the balance bottom
housing.
Figure 3-36 Strain Gage Load cell removed (Notice the difference of the bottom housing).