Effective April 2006
11
Pre-Installation Check Instructions
Although every Oxygen Generator is thoroughly tested and checked before it is
shipped from our factory, the following checks are necessary to insure that none of
the internal components have been damaged in shipment. This check should take
less than five minutes to perform.
1.) Make a visual inspection of the machine and make sure all parts are properly
attached.
2.) Sieve settles during shipment, therefore it is important to re-pack the supplied
sieve to the top of the sieve beds making sure no empty voids are left in the beds.
The sieve can be harmed by exposure to air and caution must be taken to keep the
sieve in the oxygen generator & the container sealed as much as possible. (See
page 12 for diagram.)
3.) The ON/CONTINUOUS/AUTO switch will need to be attached to the enclosure
door. (See page 13 or 14 for a diagram depending on the type of switch you have.)
4.) These checks are for machines with the touchscreen option:
a. Ensure the touch screen is powered, and a display is visible. Consult the
troubleshooting guide in this manual (see page 14) for any problems
encountered.
b. After selecting a language and entering a password, start the machine by
pressing both the
OPERATING MODE
(Automatic), and then the
ON/OFF
pushbuttons.
Содержание OG-75
Страница 15: ...Effective April 2006 12 Sieve Re packing Diagram...
Страница 26: ...Effective April 2006 23 Process Flow Schematic...
Страница 27: ...Effective April 2006 24 Process Flow Schematic Touchscreen Option...
Страница 29: ...Effective April 2006 26 External Components Drawing 22 G G 22...
Страница 33: ...Effective April 2006 30 Internal Components Drawing SMC SMC Direct 05 LOGIC Koyo SMC...
Страница 49: ...Effective April 2006 46 Manifold Drawing...