Effective April 2006
1
Unpacking Instructions
The crate should be opened and inspected immediately upon delivery. If the
exterior of the crate is noticeably damaged at the time of delivery, make a note on the
freight bill before signing it. Unpack the unit at once and perform a visual inspection to
determine if it is dented, bent or scratched. Also check to make sure the power cord is
attached and that the control panel has not been damaged in any way during shipment.
Do not discard the shipping crate. If for any reason the unit should need to be
returned in the future the user will be responsible for packaging the unit to the same
degree that it was received from OGSI to ensure its undamaged arrival at OGSI.
If any damage is discovered during the initial visual inspection, call the Freight
Company immediately.
This must usually be done within 24 hours of delivery
.
Claims of damage due to freight handling can only be filed by you, the consignee, as
OGSI
shipping terms are Free On Board (FOB), North Tonawanda, NY USA. This
means that once the equipment leaves our dock you are the owner of it.
OGSI
has no
legal claim to make against any shipping company for damage.
At
OGSI
, we are committed to using shipping companies with good reputations
for taking care in the handling of freight and providing service in the event of damage.
When you call OGSI for your Return Authorization Number please ask us about
preferred shipping companies.
Содержание OG-75
Страница 15: ...Effective April 2006 12 Sieve Re packing Diagram...
Страница 26: ...Effective April 2006 23 Process Flow Schematic...
Страница 27: ...Effective April 2006 24 Process Flow Schematic Touchscreen Option...
Страница 29: ...Effective April 2006 26 External Components Drawing 22 G G 22...
Страница 33: ...Effective April 2006 30 Internal Components Drawing SMC SMC Direct 05 LOGIC Koyo SMC...
Страница 49: ...Effective April 2006 46 Manifold Drawing...