Officine Gullo
14
How to install the gas regulator:
1)Unscrew the hex nut.
2) Choose the proper gas regulator
(NAT = natural gas; LP = LPG)
NAT: set for natural gas
LP: set for LPG
3) Insert the gas regulator, in the chosen side, in the hex cap.
4) Put the hex nut in place and screw it in.
15
Officine Gullo
GAS CONNECTIONS
This appliance must be installed by an approved installer or a gas technician
1. The installation of this appliance must conform with all applicable local codes. In the absence of local codes, the
installation must conform to the latest level of the National Fuel Gas Code, ANSI Z223.1/NFPA 54. In Canada,
the installation must be in accordance with the current CAN/CGA B149.1 and B149.2.
2. This appliance can be configured to work with either natural gas or LP gas. Verify that the appliance and the
incoming gas supply are compatible. Check the rating plate.
3. The gas supply line must be the same size or larger than the gas inlet of the appliance. Your appliance has ¾”
NPT gas inlet connection at the factory supplied gas regulator for each gas input. We recommend the supply line
be ¼” NPT larger than the gas inlet of the appliance.
4. Sealant used on pipe joints must be resistant to LP gas.
5. An installer provided manual shut-off valve must be installed in the gas supply line ahead of the appliance. This
shut-off must be easily accessible in case of emergency.
6. All gas cooking equipment must have a pressure regulator on the incoming service line for safe and efficient
operation. This appliance is equipped with such a gas pressure regulator. Incoming gas pressure should be checked
with a manometer.
The correct manifold pressure for natural gas is 4.0” iwc. For LP gas the correct manifold pressure is 10” iwc.
7. Incoming line pressure upstream of the appliance should be 1.0” iwc greater than the operating manifold
pressure. Service pressure may fluctuate for a variety of reasons. Under no circumstances should the factory supplied
regulator be removed or by-passed.
8. The factory supplied pressure regulator will withstand an input pressure of ½ PSI
(13” iwc). If the incoming pressure exceeds the maximum rating, a step-down regulator is required.
9. The appliance and its individual shut-off valve must be disconnected from the gas
supply line during any pressure testing in excess of ½ PSI [3.5 kPa].
10. The appliance must be disconnected from the gas supply by closing its individual
shut-off during any pressure testing less than ½ PSI [3.5 kPa].
11. Check to see that all installer supplied pipes and fittings are clear of debris, threading chips or other foreign
particles before connecting the appliance to the supply line. Such particles will clog orifices and/or valves when
pressure is applied. Service to clean such clogs is not covered by your warranty.
12. The incoming gas supply is brought from the inlet pipe. This is the only connection
required via the installer-supplied shut-off valve.
13. If the appliance is to be installed with flexible couplings and/or a “quick disconnect” the installer must use a
commercially approved AGA Design certified flexible connector at least ½” NPT that complies with ANSI Z21.41.
In Canada, the connector must comply with CAN 16.10-88 and the “quick disconnect” device must comply with
CAN 16.19M-79 and installed with a strain relief device.
14. Before putting the appliance into service test all gas connections for leaks. Use a soapy solution. DO NOT USE
AN OPEN FLAME TO CHECK FOR LEAKS. Such a procedure is dangerous, and it may not detect all the small leaks
that a soapy solution will
15. Air shutter adjustments are preset at the factory. These adjustments may need to be redone and/or fine tuned
by the installer.
Содержание GES8MPU
Страница 2: ...Officine Gullo 2...
Страница 25: ...25 Officine Gullo...
Страница 26: ...Officine Gullo 26...
Страница 27: ...27 Officine Gullo...