![Octagon XE-900 Скачать руководство пользователя страница 54](http://html.mh-extra.com/html/octagon/xe-900/xe-900_reference-manual_723613054.webp)
54
Battery backup for real time calendar clock
An AT battery can be installed to back up the CMOS real time clock. The battery
can be installed J17.
Installing an AT battery
1. Power off the XE–900 SBC.
2. Install the 3.6V AT clock battery at J17.
Table 6–1 Battery connector
J17 – battery connector
Pin # Pin Name
1
B
2
Key
3
nc
4
Battery –
Note
See Appendix A: Mating connectors for mating information on the battery
connector.
Содержание XE-900
Страница 19: ...19 Figure 2 1 XE 900 SBC component diagram top ...
Страница 20: ...20 Figure 2 2 XE 900 SBC component diagram bottom ...
Страница 21: ...21 Figure 2 3 XE 900 SBC dimensions without Integrated Conductive Cooling System ...
Страница 38: ...38 ...
Страница 91: ...91 Figure 15 2 Dimensions for the Integrated Conductive Cooling System ...