
NXP Semiconductors
S32K3X4EVB-Q257 | S32K3X4EVBQ257ND
HWUM
Hardware User Manual
S32K3X4EVB-Q257 HWUM
All Information provided in this document is subject to legal disclaimers
© NXP B.V. 2020. All rights reserved
NXP Semiconductors
REV B
– 9/2021
Page
7
of
36
6 S32K3X4EVB-Q257 and S32K3X4EVBQ257ND -
Startup
Follow these steps to connect and power on the board
1. Carefully unpack the S32K3X4EVB-Q257 and observe ESD preventive measures while handling the K3 development board.
2. Connect necessary cables between host PC and EVB board prior to applying power to the EVB.
3. The power-ON sequence for the EVB must be as follows:
a)
- The power switch -SW10 must be in OFF position before to the EVB be connected to an external
power supply.
b)
- Once the power switch -SW10 is in OFF position, then the EVB can be connected to an external power
supply.