background image

       Opera ting instruction a nd documenta tion                                                         

                                            UNI-LIFT 6500 - 8000

 

UNI LIFT 6500 - 8000 

- 40 - 

Version 1.0 

•   Fasten set screw when the upper parts of the ratchets have passed the last ratchet 
cog and the ratchets cannot engage anymore (see picture 5) 
•   Remove supports from ratchets at both cylinders 

 

picture 3 

 

 

       

picture 4 

 

 

 

picture 5. 

 

The supports must be removed before lowering the lift to the ground. Otherwise the 

lift can be seriously damaged. 

 

Valve with central 
emergency lowering 

Содержание UNI-LIFT 6500

Страница 1: ...te 05 2018 Operating instruction and documentation Serial number Otto Nu baum GmbH Co KG Korker Stra e 24 D 77694 Kehl Bodersweier Tel 49 0 7853 8990 Fax 49 0 7853 8787 E mail info nussbaum group de h...

Страница 2: ...Hydraulic diagram 31 3 9 Pneumatic diagram 32 3 10 Hose connection scheme 33 4 Safety regulations 34 5 Operations instructions 34 5 1 Lifting the vehicle 34 5 2 Lowering the vehicle 36 5 3 Equalizati...

Страница 3: ...ersons working with the lift Especially the chapter Safety accident Prevention has to be observed In addition to the safety remarks of the instructions for use the regulations and instructions being v...

Страница 4: ...nspection works and time intervals including Details for exchange of parts part components as mentioned in the instructions for use are to be adhered These works must only be carried out by expert per...

Страница 5: ...y competent please delete as applicable The initial safety check was carried out by a competent person before the initial operation The operating authority confirms the correct installation of the aut...

Страница 6: ...d the lift was started The persons below were introduced after the installation of the automotive lift The introduction was carried out from an erector of the lift manufacturer or from a franchised de...

Страница 7: ...ety checks of the lift They are called experts and competent persons in this document Experts are persons for example self employed engineers experts which have received instruction and have experienc...

Страница 8: ...t It is not allowed to climb on the lift or on the vehicle It s not allowed to install the standard automotive lift in a hazardous location or washing bays After changes of the construction and after...

Страница 9: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 9 Version 1 0 2 5 CE Zeichen Konformit tserkl rung...

Страница 10: ...l tank approx 14 Litre Sound level LPA 70 dB Connection by customer 3 N PE 400V 50 Hz standard version with fuse T16A Pay attention to the voltage of your country 3 2 Safety devices 1 Pressure relief...

Страница 11: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 11 Version 1 0 3 3 Datasheet...

Страница 12: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 12 Version 1 0...

Страница 13: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 13 Version 1 0...

Страница 14: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 14 Version 1 0...

Страница 15: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 15 Version 1 0...

Страница 16: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 16 Version 1 0 3 4 Foundation plan...

Страница 17: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 17 Version 1 0...

Страница 18: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 18 Version 1 0...

Страница 19: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 19 Version 1 0...

Страница 20: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 20 Version 1 0...

Страница 21: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 21 Version 1 0...

Страница 22: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 22 Version 1 0 3 5 Dowel drilling pattern...

Страница 23: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 23 Version 1 0 3 6 Force diagramm...

Страница 24: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 24 Version 1 0 3 7 Electrical diagram...

Страница 25: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 25 Version 1 0...

Страница 26: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 26 Version 1 0...

Страница 27: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 27 Version 1 0...

Страница 28: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 28 Version 1 0...

Страница 29: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 29 Version 1 0...

Страница 30: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 30 Version 1 0...

Страница 31: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 31 Version 1 0 3 8 Hydraulic diagram...

Страница 32: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 32 Version 1 0 3 9 Pneumatic diagram 0 1 Pneumatikventil 960047 1 0 Pneumatikzylinder...

Страница 33: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 33 Version 1 0 3 10 Hose connection scheme Anschl sse im Bedienaggregat...

Страница 34: ...e Version with wheel free lift The correct position of the polymer pads has to be checked after the vehicle has been lifted a little bit It s not allowed to stay under the lifted or lowered vehicle ex...

Страница 35: ...ar use the parking brake Check the dangerous places of the lift and be sure that there are no objects or people in the immediate area of the lift or on the lift Switch on the control system main switc...

Страница 36: ...g lowering 5 3 Equalization of the platforms If the difference in heights is constantly present proceed as follows Equalize the rails only without load Remove any kind of load from the lift before sta...

Страница 37: ...of trouble cannot be found please call the technical service Repairs at the lift s security devices as well as repairs and examinations of the electrical fittings may only be performed by specialists...

Страница 38: ...ift drives with the slave side on an obstacle the photoelectric cell observes the equalization of the lift If the lift is unequal the lift stops automatically In this case push the override switch in...

Страница 39: ...draulic hoses are damaged restore them and go on as described in the operating instructions 6 4 Emergency lowering Loosen security nut marked with red colour at the valve located at the bottom of each...

Страница 40: ...of the ratchets have passed the last ratchet cog and the ratchets cannot engage anymore see picture 5 Remove supports from ratchets at both cylinders picture 3 picture 4 picture 5 The supports must be...

Страница 41: ...ces or valves have been replaced 7 Inspection and Maintenance of Nussbaum lifts Before conducting maintenance work preparations must be made to ensure that during maintenance and repairwork there is n...

Страница 42: ...aper grain 120 After this is complete use a suitable paint observe the RAL Number Check all zinc surfaces and repair them with abrasive paper grain 280 White rust can result from humid storage and poo...

Страница 43: ...nfluences aggressive deposit of all manner constant humidity because of insufficient ventilation lentic liquids in the pits How often the lift needs to be cleaned depends on the frequency of usage the...

Страница 44: ...e performed by an expert This manual contains forms with a schedule for the security checks Please fill out the adequate form for the different security checks The form should remain in this manual af...

Страница 45: ...to be lifted once more marginally by pushing the button lift After that repeat procedure described earlier until oil leaks Perform balancing of rails as described in chapter 5 3 Lift up automotive lif...

Страница 46: ...4 Changing the installation place If the place of installation shall be changed the new place has to be prepared according to the regulations of the first installation The changing should be performe...

Страница 47: ...ling depth a 100 Min anchorage depth b 80 Thickness of concrete c min 160 Diameter of bore d 20 Thickness of the lift pieces e 0 40 Number of dowels 12 Starting torque 70 minimum thickness of concrete...

Страница 48: ...depth mm b 80 80 80 Thickness of concrete mm c min 160 min 160 min 160 Diameter of bore mm d 20 20 20 Thickness of the lift pieces mm e 40 65 65 100 100 140 Betonqualit t min C20 25 Number of dowels...

Страница 49: ...t d une force Tinst 20 40 80 Gesamtl nge mm Total length Longueur totale l 130 150 200 Gewinde Thread fil M 10 12 16 St ckzahl piece number nombre des pi ces a 4 b 8 c 10 d 12 e 14 f 16 g 28 Die Monta...

Страница 50: ...re de l al sage do 15 18 24 Bauteildicke thickness of the lift piece Epaisseur de la pi ce tfix 0 50 0 100 0 100 Anzugsdrehmoment Nm turn ng moment moment d une force MD 40 80 120 Gesamtl nge Total le...

Страница 51: ...e of the dowels bolts Torque of the screws Coupling at power unit Condition surface plungers Condition of the covers Closeness of the hydraulic system Level of the hydraulic oil Condition of hydraulic...

Страница 52: ...of the dowels bolts Torque of the screws Coupling at power unit Condition surface plungers Condition of the covers Closeness of the hydraulic system Level of the hydraulic oil Condition of hydraulic...

Страница 53: ...of the dowels bolts Torque of the screws Coupling at power unit Condition surface plungers Condition of the covers Closeness of the hydraulic system Level of the hydraulic oil Condition of hydraulic...

Страница 54: ...of the dowels bolts Torque of the screws Coupling at power unit Condition surface plungers Condition of the covers Closeness of the hydraulic system Level of the hydraulic oil Condition of hydraulic...

Страница 55: ...of the dowels bolts Torque of the screws Coupling at power unit Condition surface plungers Condition of the covers Closeness of the hydraulic system Level of the hydraulic oil Condition of hydraulic...

Страница 56: ...of the dowels bolts Torque of the screws Coupling at power unit Condition surface plungers Condition of the covers Closeness of the hydraulic system Level of the hydraulic oil Condition of hydraulic...

Страница 57: ...of the dowels bolts Torque of the screws Coupling at power unit Condition surface plungers Condition of the covers Closeness of the hydraulic system Level of the hydraulic oil Condition of hydraulic...

Страница 58: ...of the dowels bolts Torque of the screws Coupling at power unit Condition surface plungers Condition of the covers Closeness of the hydraulic system Level of the hydraulic oil Condition of hydraulic...

Страница 59: ...of the dowels bolts Torque of the screws Coupling at power unit Condition surface plungers Condition of the covers Closeness of the hydraulic system Level of the hydraulic oil Condition of hydraulic...

Страница 60: ...he dowels bolts Torque of the screws Coupling at power unit Condition surface plungers Condition of the covers Closeness of the hydraulic system Level of the hydraulic oil Condition of hydraulic hoses...

Страница 61: ...Operating instruction and documentation UNI LIFT6500 8000 UNI LIFT 6500 8000 61 Version 1 0 Notes...

Страница 62: ...000 62 Version 1 0 Otto Nu baum GmbH Co KG Kundendienst Korker Str 24 D 77694 Kehl Bodersweier www nussbaum group de e Mail service nussbaum group de Service Hotline Germany 0800 5 288 911 Service Hot...

Отзывы: