background image

 

Operating Instruction and Documentation 

                                                                                                                        

2.30 SPL                      

 

- 13 - 

 
 

Electrical Parts List

 

 

Q1 

  Main 

switch 

           990129          

M1   Motor 

             991033 

F1 

  Fuse 

             990299     

F2 

  Fuse 

             990286 

F3 

  Fuse 

             990299 

S1 

  Button 

“lifting!           990334 

S5 

  Button 

“lowering”          990300 

K1 

  Up 

contactor           991002 

T1 

  Transformer 

           991002 

S1 

  Top 

limit 

switch 

          990003 

Y1 

  Magnet 

coil 

           980654 

Y2 

  Magnet 

coil 

           980654 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 

 
 
 
 

Содержание 2.30 SPL

Страница 1: ...2004 Operating instructions and documentation Serial number Nu baum Hebetechnik GmbH Co KG Korker Stra e 24 D 77694 Kehl Bodersweier Tel 49 0 7853 8990 Fax 49 0 78 53 87 87 E mail nussbaum lifts t onl...

Страница 2: ...ic diagram drawing 14 4 Safety regulations 15 5 Operating Instructions 15 5 1 Lifting the vehicle 16 5 2 Lowering the vehicle 16 6 Troubleshooting 17 6 1 Lowering onto an obstacle 17 6 2 Emergency low...

Страница 3: ...te safety regulations and the operating procedures of the place of operation must also be considered Obligations of the operator The operator is obliged to allow only those persons complying to the fo...

Страница 4: ...to be adhered to These works must only be carried out by expert personal After maintenance and repair works loose screws nuts and bolts must always be firmly tightened Guarantee and liability Our Gen...

Страница 5: ...was installed on at the firm at The initial safety check was carried out and the lift was started The installation was carried out by the operating authority competent please delete as applicable The...

Страница 6: ...started The persons below were introduced after the installation of the automotive lift The introduction was carried out from an erector of the lift manufacturer or from a franchised dealer competent...

Страница 7: ...They are called experts and competent person in this document Experts are persons for example self employed engineers experts which have received instruction and have experience to check and to test...

Страница 8: ...the standard automotive lift in a hazardous location or washing bays After changing the construction and after repair the lift has to be checked by an expert again The operating instruction and the i...

Страница 9: ...Operating Instruction and Documentation 2 30 SPL 9 Page for notice...

Страница 10: ...l tank approx 10 Liter Sound level 75 dB A Connection by customer 3 N PE 400V 50 Hz fuse T16A time lag fuse observe your state regulations 3 2 Safety device 1 Safety device at the carrying arms Safety...

Страница 11: ...Operating Instruction and Documentation 2 30 SPL 11 3 3 Data sheet...

Страница 12: ...Operating Instruction and Documentation 2 30 SPL 12 3 4 Electrical diagram drawing...

Страница 13: ...Parts List Q1 Main switch 990129 M1 Motor 991033 F1 Fuse 990299 F2 Fuse 990286 F3 Fuse 990299 S1 Button lifting 990334 S5 Button lowering 990300 K1 Up contactor 991002 T1 Transformer 991002 S1 Top li...

Страница 14: ...ydraulik parts list 0 1 Oil tank 0 2 motor 991033 0 3 gear pump 1BK7D9 2Q 0 4 Oil filter 980012 0 5 Oil level gauge 980098 0 6 Hydraulic block 230SPL01053 0 7 Holding valve 980480 0 8 Pressure relief...

Страница 15: ...he automotive column lift must be checked by an expert after changes in the construction have been made The main switch must be switched off and locked before work on the vehicle can commence This is...

Страница 16: ...Closely observe how the vehicle is positioned on the lifting pads If the vehicle is not correctly positioned on the pads the vehicle is not secure and the risk exists that the vehicle may fall Raise t...

Страница 17: ...tive Leakage in the hydraulic system Unload the vehicle Refills Call the technical service Call the technical service Check if leakage is present Call the technical service Problem the lift does not l...

Страница 18: ...d their local retailers A service must be performed at regular intervals of 3 months through the operator in accordance with following service manual If the lift is in continuous operation or in a dir...

Страница 19: ...h an abrasive paper grain 120 After this is complete use a suitable paint observe the RAL Number Check the zinc surface and repair it with a suitable tool Use abrasive paper grain 280 White rust can r...

Страница 20: ...r and the automotive lift A permanent contact with every kind of liquid is forbidden Do not use any high pressure device for cleaning the lift 8 Security check The security check is necessary to guara...

Страница 21: ...provided The supply line must be protected with T16A VDE0100 German regulation The minimum diameter amounts to 2 5 mm Pay attention to the tension of your state All cable ducts have to be equipped wi...

Страница 22: ...hydraulic pipe of the cylinder with the screw fitting If necessary you have to adjust the hydraulic pipe To avoid damages save the electrical cable to supply the electrical magnet with cable clips at...

Страница 23: ...be chosen according to picture 7 Check line up of the columns and look if they are vertical If they aren t vertical correct with suitable bases thin metal sheets In case of vibration of the columns p...

Страница 24: ...arrying arms refer to data sheet lubricate bolts and secure them with enclosured circlips at both ends Mount a safety plate Pos B in addition to prevent that the bracket while lowering to an obstacle...

Страница 25: ...lowest position Switch off the main switch and lock it Loose and remove the plug of the power supply Remove the cover of the tank Remove the oil from tank Loose the equalization ropes at the top of th...

Страница 26: ...depth a 115 140 min Anchorage depth b 85 85 Thickness of concrete c see the foundation diagram Diameter of bore d 20 20 Thickness of lift pieces e 0 40 40 65 Number of dowels 12 12 Starting torque ac...

Страница 27: ...175 215 min Anchorage depth b 85 85 85 85 Thickness of concrete c see the foundation diagram Diameter of bore d 20 20 20 20 Thickness of lift pieces e f 40 65 65 90 90 100 100 140 Number of dowels 12...

Страница 28: ...Fundamentplan see current foundation diagram drawing vois le plan de fondation actuel Bohrerdurchmesser diameter of bore Diam tre de l al sage do 15 18 24 Bauteildicke thickness of the lift piece Epa...

Страница 29: ...ition of the hydraulic unit F F F Condition surface piston rod F F F Condition of the covers F F F Condition welding F F F Closeness of the hydraulic system F F F Level of the hydraulic oil F F F Cond...

Страница 30: ...tion of the hydraulic unit F F F Condition surface piston rod F F F Condition of the covers F F F Condition welding F F F Closeness of the hydraulic system F F F Level of the hydraulic oil F F F Condi...

Страница 31: ...tion of the hydraulic unit F F F Condition surface piston rod F F F Condition of the covers F F F Condition welding F F F Closeness of the hydraulic system F F F Level of the hydraulic oil F F F Condi...

Страница 32: ...tion of the hydraulic unit F F F Condition surface piston rod F F F Condition of the covers F F F Condition welding F F F Closeness of the hydraulic system F F F Level of the hydraulic oil F F F Condi...

Страница 33: ...tion of the hydraulic unit F F F Condition surface piston rod F F F Condition of the covers F F F Condition welding F F F Closeness of the hydraulic system F F F Level of the hydraulic oil F F F Condi...

Страница 34: ...tion of the hydraulic unit F F F Condition surface piston rod F F F Condition of the covers F F F Condition welding F F F Closeness of the hydraulic system F F F Level of the hydraulic oil F F F Condi...

Страница 35: ...tion of the hydraulic unit F F F Condition surface piston rod F F F Condition of the covers F F F Condition welding F F F Closeness of the hydraulic system F F F Level of the hydraulic oil F F F Condi...

Страница 36: ...tion of the hydraulic unit F F F Condition surface piston rod F F F Condition of the covers F F F Condition welding F F F Closeness of the hydraulic system F F F Level of the hydraulic oil F F F Condi...

Страница 37: ...tion of the hydraulic unit F F F Condition surface piston rod F F F Condition of the covers F F F Condition welding F F F Closeness of the hydraulic system F F F Level of the hydraulic oil F F F Condi...

Страница 38: ...of the hydraulic unit F F F Condition surface piston rod F F F Condition of the covers F F F Condition welding F F F Closeness of the hydraulic system F F F Level of the hydraulic oil F F F Condition...

Страница 39: ...Operating Instruction and Documentation 2 30 SPL 39...

Страница 40: ...Operating Instruction and Documentation 2 30 SPL 40...

Страница 41: ...Operating Instruction and Documentation 2 30 SPL 41...

Страница 42: ...Operating Instruction and Documentation 2 30 SPL 42...

Отзывы: