8
Contents:
1 x Operator Manual
2 x Battery charging lead
2 x Keys
4 x 40 amp fuses (1 x spare)
2 x Side pod skirts
1 x Brake disengage key
1 x Maxi fuse-puller
Quick Set-Up Guide
PLEASE READ BEFORE COMMENCING ANY OPERATION.
AFTER THE REMOVAL OF ALL THE PACKAGING,
CAREFULLY OPEN AND CHECK THE CONTENTS OF THE START UP PACK FIG.1.
!
!
Note: Ensure that no metal objects come into contact with battery terminals while the batteries are exposed.
When inserting the first fuse you may notice a spark, this is normal.
Lift top tank assembly to reveal battery compartment.
Always lift between points as illustrated to ensure personal safety.
Fit battery fuses (contained in start-up pack) into the battery fuse holders as illustrated (Fig.1).
Remove transit block from pallet (Fig.2).
Insert key into main control (on / off) and turn quarter-turn clockwise to position (
1
) ‘On’ (Fig.3).
Ensure that the forward / reverse switch is set to forward (Fig.4).
Depress accelerator pedal with right foot and slowly drive machine off of the pallet using the ramp
provided (Fig.5).
Note: The seat is fitted with a pressure sensor that disables the machine until
an operator is seated.
When the machine is removed and in a safe position, turn key back to the position (
0
) ‘OFF’ (Fig.6).
1
1a
5
6
2
3
4
Содержание TTV 678
Страница 28: ...28 Notes TTV 678 Schematic Diagram...
Страница 29: ...29 Notes...
Страница 31: ...31...