Page 6
Timer Operation
Valve State:
INI (Initializing)
INI will display on the screen for 30 to 5 seconds when initializing after a power failure reset or programming.
RGQ (Regeneration Queued)
RGQ indicates that the reserve has been entered in a delayed system and regeneration has been queued.
When in the main screen, press the Shift button to toggle service (SRV) with RGQ.
Service (SRV)
SRV will display when the unit is in service.
LED Status Lights:
Blue LED:
Illuminates while the unit is in service and no errors exist. The unit will always be in service unless a
regeneration trigger has occurred (green LED light will be displayed).
Green LED:
Illuminates when the unit is in Regeneration mode, unless an error condition exists.
Red LED:
Illuminates when there is an error.
Flow Indicator:
A rotating line (appearing as a rotating star shape) will display on the screen when flow is going through the
the meter.
Содержание 7000XTR
Страница 1: ...Model 7000XTR Service Manual IMPORTANT Fill in Pertinent Information on Page 3 for Future Reference ...
Страница 21: ...Page 21 Notes ...
Страница 22: ...Page 22 Power Head Assembly 61501 7000XT_REVA ...
Страница 34: ...Page 34 Brine Tank Refill Position 40988_REVA 41121_REVA Water Conditioner Flow Diagrams ...
Страница 38: ...Page 38 Dimensional Drawings 61500 7000XTR LNE_REVA ...
Страница 39: ...Page 39 Meter Flow Data TR18753 Softener TR18688 Filter 41140 02_REVA ...
Страница 40: ...Page 40 Injector Flow Data TR18755_REVB ...
Страница 41: ...Page 41 Notes ...
Страница 42: ...Page 42 Notes ...
Страница 43: ...Page 43 Notes ...
Страница 44: ...P N 42484 Rev A ...