OM0301
August 20
Page 58 of 105
Step 3: Place a velometer in the cabinet workzone on the horizontal plane 4 inches (102mm) above the
bottom edge of the window. Spot check several points on the recommended downflow velocity
Step 4: Press + or – button of supply duty cycle to adjust blower speed.
The objective of this spot check is to obtain the desired downflow average velocity as close as
possible to the stated goal of 60 LFPM (.30 m/s).
DON'T SPEND MORE THAN 5 MINUTES SPOT CHECKING.
Содержание LabGard ES NU-565-400
Страница 7: ...OM0301 August 20 Page 7 of 105...
Страница 9: ...OM0301 August 20 Page 9 of 105...
Страница 10: ...OM0301 August 20 Page 10 of 105...
Страница 11: ...OM0301 August 20 Page 11 of 105...
Страница 17: ...OM0301 August 20 Page 17 of 105...
Страница 18: ...OM0301 August 20 Page 18 of 105...
Страница 45: ...OM0301 August 20 Page 45 of 105...
Страница 50: ...OM0301 August 20 Page 50 of 105...
Страница 82: ...OM0301 August 20 Page 82 of 105...
Страница 98: ...OM0301 August 20 Page 98 of 105...
Страница 99: ...OM0301 August 20 Page 99 of 105...
Страница 100: ...OM0301 August 20 Page 100 of 105...
Страница 101: ...OM0301 August 20 Page 101 of 105...
Страница 102: ...OM0301 August 20 Page 102 of 105...
Страница 103: ...OM0301 August 20 Page 103 of 105...
Страница 104: ...OM0301 August 20 Page 104 of 105...
Страница 105: ...OM0301 August 20 Page 105 of 105...