82
Part 1 - General Safety Information
Part 12 - Installation Checklist
Table 33 - Installation Checklist
Wiring
Yes
Note
Has the power and control been wired per boiler wiring diagram, this manual?
Is the main electrical connection polarity within boiler requirements?
Does the power supply voltage agree with the boiler rating plate? 120V AC?
Start-Up, Adjust, and Test
Yes
Note
Has the boiler been started?
If necessary, has the boiler gas valve been adjusted?
Has the installation been customized per installation location requirements?
Have all customized system parameters been tested?
Has proper boiler operation been confirmed?
Burner Flame
Yes
Note
Has the burner flame been checked?
Have combustion values been verified with a calibrated combustion analyzer?
If the flame does not appear normal, it may need to be cleaned by a qualified service technician. See flame
sight glass window location.
Final Installation Approvals
Signed by Technician
Date
Содержание FTVN
Страница 98: ...98 Maintenance Notes...