NRG INSTRUCTIONS
Windcube PV Trailer
Windcube_PVTrailer_ModerateClimate_Instructions
Rev. 2
[email protected] | Page 7
27 March 2018
to get the cable through. Connect it to the modem inside the electrical cabinet. See Section 5
modem details.
c.
Install an Ethernet cable through the strain relief in the front and connect it between the Windcube
and the Ethernet switch in the electrical cabinet.
d.
Connect the DC Power Supply Cable that comes with the Windcube to the power cable on the front
of the trailer. Connect to other end to the Windcube.
e.
Put the Windcube wiper pump into the provided 5 gallon bucket and feed the wiring through the
hole in the lid. Fill the bucket with distilled or deionized water and it hang under the Windcube
platform. Plug the power cable into the Windcube connection cabinet and the pump hose into the
Windcube’s wiper arm.
f.
Once fully commissioned install the metal siding around the three exposed sides of the platform.
i.
Fit the front side on first. The bottom of the panel sits in front of the lip of the platform.
ii.
Secure the front side by installing lower front bolts hand tight
iii.
Thread bolts out thru main frame upper hole, so side panels can be hung on these, and the
bolts facing out on the front panel angles.
iv.
Then hang northern side on upper bolts and secure with wing nuts. Install remainder of
bolts in lower holes. Hand tighten.
v.
Install the south side last because it allows access to the Windcube’s connection cabinet.
Hang side panel. Use wing nuts on upper bolts and thread in remaining bolts in lower holes.
vi.
When all bolts are installed go around and tighten them all.