NRG INSTRUCTIONS
Windcube PV Trailer
Windcube_PVTrailer_ModerateClimate_Instructions
Rev. 2
[email protected] | Page 11
27 March 2018
Section 8: Commissioning Report
Summary
Summary of scope of work here…
Preparations ahead of the installation were made by __________ , including:
Enter info here
Enter info here
The installation was completed XX/XX/XXXX and took approximately X days.
Site Description
Access to the site is via…
The installation site is…(describe site’s proximity to other nearby landmarks or features)
The area around the installation site….describe landscape and soil, note any unusual features.
Configuration
General Info
Client Name
System Installed
Windcube WLS7-XXX; NRG Systems PV/Battery Trailer - XXX
Date of Field Work:
Location:
Client contact name:
Telephone
Field engineer
Client participants