Novus N1200 Скачать руководство пользователя страница 5

Controller N1200  

NOVUS AUTOMATION 

5 / 13 

Power Supply Connections 

 

Observe the power 

requirement for the 

unit. of required power 

supply  

 

Figure 2

 – Power supply connections  

Input Connections 

 

Thermocouple (T/C) and 0-50 mV  

The 

Figure 3a

 indicates the wiring for the thermocouple and 0-50mV 

signals.  If  the  thermocouple  wires  needs  to  be  extended,  use 
appropriate compensation cables.  

 

RTD (Pt100): 

 

Figure 3b

 shows the Pt100 wiring, for 3 conductors. For proper cable 

length  compensation,  use  conductors  of  same  gauge  and  length). 
For  4-wires  Pt100,  leave  one  conductor  disconnected  at  the 
controller. For 2-wire Pt100, short-circuit terminals 11 and 12.  

 

T/C, 0-50mV

 

 

Figure 3a

 - Connection of T/C, 

  0-50mV  

Figure 3b

 - Connection of three 

   

wire Pt100-3  

 

4-20 mA: 

The  connections  for  current  signals  4-20  mA  must  be  carried-out 
according to 

Figure 4a

.  

 

 

 

Figure 4a

 - Current connection  

 

4-20 mA 

Figure 4b

 - Connection for 5V 
  and 10V  

 

5 V and 10 V  

Refer to 

Figure 4b

 for connecting voltage signals. 

Remote Setpoint 

Feature  available  in  the  controller's  terminals  9  and  10.  When  the 
Remote  SP  input  signal  is  0-20  mA  or  4-20  mA,  an  external 

100



shunt resistor of must be connected to terminals 9 and 10 as 

indicated in 

Figure 4c

.  

 

 

Figure 4c

 - Connection for remote SP  

Digital Input Connections 
Figures 5a

 and 

5b

 show switches driving I/O 3 and I/O 5. The same 

scheme applies to I/O 4  

 

 

 

Figure 5a 

– I/ O3 a Digital Input 

Figure 5b – 

I/O5 a Digital Input 

Connection of Alarms and Outputs  

The I/O channels, when configured as outputs, must have their load 
limit capacities observed, according to the product specifications.  

 

 

 

Figure 6a 

– I/ O3 or I/O4 with 

output pulse for SSR.

 

 

Figure 6b 

– I/O5 with output 

pulse for SSR. 

I/O3, I/O4 and I/O5 can also be configured as digital outputs (I/O3 and 
I/O4 provide a 5 Vdc output signal whereas I/O5 a 12 Vdc signal). An 
example of usage is shown in 

Figure 6a

 for the I/O3 and in 

Figure 6b

 

for the I/O5. I/O5 is electrically isolated from the sensor input 

OPERATION 

The controller's front panel, with its parts, can be seen in the 

Figure 7

:  

 

Figure 7 - 

Identification of the parts referring to the front panel  

Display  of  PV/Programming: 

Displays  the  current  value  of  PV 

(

Process

 

Variable

).  When  in  configuration  mode,  it  shows  the 

parameters names.  

Display  of  SP/Parameters: 

Displays  the  value  of  SP  (

Setpoint

). 

When in configuration mode, it shows the parameters values.  

COM  indicator: 

Flashes  to  indicate  communication  activity  in  the 

RS485 interface.  

TUNE indicator: 

Stays ON while the controller is in tuning process.  

MAN  indicator: 

Signals  that  the  controller  is  in  the  manual  control 

mode.  

RUN indicator: 

Indicates that the controller is active, with the control 

output and alarms enabled.  

OUT indicator: 

For relay or pulse control output; it reflects the actual 

state  of  the  output.  If  an  analog  output  is  assigned  for  control,  the 
OUT indicator lights continuously. 

A1,  A2,  A3  and  A4  indicators: 

signalize  the  occurrence  of  alarm 

situation.  

 

 

P Key (Program key):

  used  to  walk  through  the  menu 

parameters.  

 

 

Back Key

:  used to retrocede parameters.  

 

 

Increment key and  

 

 

-

  Decrement  key: 

allow  altering  the 

values of the

 

parameters. 

When the controller is powered on, its firmware version is presented 
for 3 seconds, after which the controller starts normal operation. The 
values of PV and SP are displayed and the outputs are enabled. 

Pt100

4-20mA

Содержание N1200

Страница 1: ...meters Automatic Manual function with bumpless transfer Four modes of independents alarms with functions of minimum maximum differential deviation open sensor and event Timer functions that can be associated to the alarms Retransmission of PV or SP in 0 20 mA or 4 20 mA Input for remote setpoint Digital input with 5 functions Programmable soft start 20 setpoint profile programs with 9 segments eac...

Страница 2: ...xecution of the selected setpoint profile program Available for I O5 or I O3 and I O4 when available Closed Enables execution of the program Open Interrupts freezes execution of the program Note Even when the execution of the program is interrupted the control output remains active and controlling the process at the point Setpoint of interruption The program will resume its normal execution starti...

Страница 3: ...th this feature enabled the controller uses for display and control a value that corresponds to the square root of the applied input signal Available only for the inputs belonging to the group of linear analogic signals 0 20 mA 4 20 mA 0 50 mV 0 5 V and 0 10 V ANALOG RETRANSMISSION OF PV AND SP The analog output when not used for control purposes is available for retransmitting the PV and SP value...

Страница 4: ... your supervisory software to conduct the MONITORING process Follow the procedure below to use the USB communication of the equipment Download the NConfig software from our website and install it on your computer The USB drivers necessary for operating the communication will be installed together with the software Connect the USB cable between the equipment and the computer The controller does not...

Страница 5: ... product specifications Figure 6a I O3 or I O4 with output pulse for SSR Figure 6b I O5 with output pulse for SSR I O3 I O4 and I O5 can also be configured as digital outputs I O3 and I O4 provide a 5 Vdc output signal whereas I O5 a 12 Vdc signal An example of usage is shown in Figure 6a for the I O3 and in Figure 6b for the I O5 I O5 is electrically isolated from the sensor input OPERATION The c...

Страница 6: ...ed 0 does not execute program 1 to 20 number of the program to be executed With enabled outputs RUN YES the program starts right after the program is selected p seg Screen for indication only When a ramp and soak program is active this parameter shows the number of the segment under execution from 1 to 9 t seg Screen for indication only When a ramp and soak program is in execution it shows the rem...

Страница 7: ...r up waiting for PV Process Variable to reach a non alarm situation From this point on the alarm will be free to actuate should a new alarm situation occur xya1 ALARM HYSTERESIS Defines the difference between the value of PV at which the alarm is xya2 xya3 xya4 triggered and the value at which it is turned off in engineering units A1t1 A2t1 A3t1 A4t1 Alarm Time t1 Defines the temporization time t1...

Страница 8: ...l I O 3 according to the Table 2 Io 4 Function of the channel I O 4 Selection of the function used in the channel I O 4 according to the Table 2 Io 5 Function of the channel I O 5 Selection of the function used in the channel I O 5 according to the Table 2 CALIBRATION CYCLE All of the input and output types are calibrated in the factory If a recalibration is required this should be carried out by ...

Страница 9: ...des the parameters on the protected levels If no password is entered the parameters of the protected cycles can only be visualized The Access Code is defined by the user in the parameter Password Change PAS present in the Calibration level The factory default for the password code is 1111 Protection of the access code The protection system built into the controller blocks for 10 minutes the access...

Страница 10: ...itiated by the controller whenever the control performance is worse than the one found after the previous tuning In order to activate the performance supervision and auto adaptative tuning the parameter ATUN must be adjusted for SELF RSLF or TGHT The controller s behavior during the auto adaptative tuning will depend on the worsening of the present performance If the maladjustment is small the tun...

Страница 11: ...ignal that corresponds to a value a little lower than the upper limit of indication f Access the parameter inLC With the keys and adjust the display reading such as to match the applied signal Then press the P key Note When checking the controller calibration with a Pt100 simulator pay attention to the simulator minimum excitation current requirement which may not be compatible with the 0 170 mA e...

Страница 12: ...Vdc 24 Vac 10 20 Maximum consumption 9 VA ENVIRONMENTAL CONDITIONS Operation Temperature 5 to 50 C Relative Humidity 80 max 30 ºC For temperatures above 30 ºC reduce 3 for each ºC Internal Use Category of installation II Degree of pollution 2 altitude 2000 m INPUT T C Pt100 voltage and current according to Table 1 Internal Resolution 32767 levels 15 bits Resolution of Display 12000 levels from 199...

Страница 13: ... Relay in I O3 DIO Digital I Os in I O3 and I O4 HBD Burnt Out Resistance detection C Digital Communication Blank basic version without serial communication 485 RS485 Modbus protocol D Power Supply Blank basic version 100 to 240 Vac dc input 24V 12 to 24 Vdc 24 Vac input voltage WARRANTY Warranty conditions are available on our web site www novusautomation com warranty ...

Отзывы: