(GB) Installation of the dock leveller 

 

Equipment for Installation  

Before installation you must have following equipment: 

 

Welding machine ESAB caddy 200 (5200A) or 
similar.  

 

Welding electrode ESAB OK 48.00 3,25 or similar.

 

Lifting Equipment  

 

Fork lift truck: Minimum carrying capacity 35 kN, 
fork length 2000 mm, or  

 

Crane: Minimum carrying capacity 30 kN at the 
given radius. 

Electrical Connections  

 

cable: 7x 0,75mm²  

 

motor cable: 4 x 1,5mm²  

 

Functional test and completing the installation  

Using the control panel put the dock leveller through all the 
normal operations (see operating manual). Check all the 
procedures. 

 

Note! 

Secure the lifting equipment only at the 
points marked with this symbol. When 
lifting with chains always use all four lifting 
eyes. When lifting with a fork truck use a 
minimum of two lifting eyes.  

 

Danger! 

Before starting any work on the electrical 
equipment, the dock leveller must be 
isolated and disabled! Only authorised 
and trained persons should undertake 
electrical work on the dock leveller!  
 

 

Danger! 

Only lifting equipment with a minimum 
carrying capacity given before, and in 
good working order should be used follow-
ing the correct operating procedure. Ob-
serve the accident prevention procedures 
of your company. Never stop or work 
under suspended loads! 

 

Note! 

Current safety regulations must be ad-
hered to!  
Electrical connections must be carried out 
by a qualified electrician according to the 
wiring diagram. 
The front of the control box may only be 
opened or closed when the mains isolator 
is at „0“. 

 

Danger! 

Keep clear of the pit edge to prevent foot 
injures! 

 

Attention! 

Ensure that all the functions of the dock 
leveller can be observed from the operat-
ing position. The location of the control 
panel should be waterproof. Should there 
be any malfunction, isolate the dock 
leveller immediately and contact 
Novoferm. 

 

Note! 

Take care of the gap of 10 ± 2 mm be-
tween platform and frame. The frame has 
to be fixed in a vertical position. 

 

Retouch painting of welded and 
damaged surfaces:  
Surfaces which shall be treated must be 
dry and well cleaned from dirt, grease, 
rust or similar. Use machine wire teasel 
and thinner.  

 

Spray cold galvanizing and let 
dry approx. 30 min.  

 

Paint with primer in two coats. 
Let dry approx. 2 hours after 
each painting.  

 

Paint with top paint. 

 

Note! 

Frame AX/ BX ( see page 16 / 17) 
 
X  Spacing sheets in the area of welds (by    
     others) 
 
Y  Hollow spaces are to be grouted. 

 

 

 

Содержание L530i

Страница 1: ...Version 0 1 Date 05 03 2013 Page 1 19 040_NF_DOCU_MONT_NovoDock_L530i_0001_Int_01 Montageanleitung Installation manual Manuel d installation Montagehandleiding NovoDock L530i...

Страница 2: ...cal preparations 7 Equipment for installation 8 Installation 9 Installation of the frame CX 10 Electrical connections 12 Option Buffers 15 Frame AX 16 Frame BX 17 Frame DX 18 Frame EX 19 FR Sommaire I...

Страница 3: ...e bener Weise und mit einer Tragf higkeit von mindestens 30 kN Beachten Sie die f r Ihr Unternehmen g ltigen Unfallverh tungsvorschriften Niemals unter schwe benden Lasten aufhalten oder arbeiten Blei...

Страница 4: ...e dock leveller Danger Only lifting equipment with a minimum carrying capacity given before and in good working order should be used follow ing the correct operating procedure Ob serve the accident pr...

Страница 5: ...bilit es sont autoris es effectuer des travaux lectriques sur les niveleurs Danger V rifiez la capacit de charge du mat riel de manutention respectez les proc dures de s curit et d utilisation Ne stat...

Страница 6: ...utoriseerd personeel worden uitgevoerd Voorzichtig levensgevaar Gebruik alleen goedgekeurde en in onberispelijke staat verkerende hefwerkktuigen zoals voorgeschreven en met een draagvermogen van minst...

Страница 7: ...AC 50Hz 230 400V Mains fuse D0 10A gl Motor power 1 5kW 11 Conduit for wiring internal diameter 70 angles 45 12 CEE receptacle 16A 13 Optional safety switch on sectional door to isolate leveller when...

Страница 8: ...tung 3 Mounting and operating instruction 4 Bedienungsanleitung 4 Operating manual 5 2 x 4 Plastikstopfen 5 2 x 4 Plastic prop 6 Kabelschelle 6 Cable clamp 7 Kabelkanal nicht im Lieferumfang enthalten...

Страница 9: ...2013 Page 9 19 Technische nderungen vorbehalten We reserve the right to alter technical specification Sous r serve de modifications techniques Technische wijzigingen voorbehouden Montage Installation...

Страница 10: ...cification Sous r serve de modifications techniques Technische wijzigingen voorbehouden Montageanleitung Rahmen CX Installation du cadre CX Installation of the frame CX Montage raamwerk CX Fl 60 x 5 9...

Страница 11: ...1 19 Technische nderungen vorbehalten We reserve the right to alter technical specification Sous r serve de modifications techniques Technische wijzigingen voorbehouden DE Punktschwei ung GB Spot weld...

Страница 12: ...fications techniques Technische wijzigingen voorbehouden Elektrische Anschl sse Branchements lectriques Electrical connections Elektrische aansluitingen DE GB FR NL L1 Braun 1 Brown 1 Brun 1 Bruin 1 L...

Страница 13: ...ersion 0 1 Date 05 03 2013 Page 13 19 Technische nderungen vorbehalten We reserve the right to alter technical specification Sous r serve de modifications techniques Technische wijzigingen voorbehoude...

Страница 14: ...on 0 1 Date 05 03 2013 Page 14 19 Technische nderungen vorbehalten We reserve the right to alter technical specification Sous r serve de modifications techniques Technische wijzigingen voorbehouden C2...

Страница 15: ...Technische nderungen vorbehalten We reserve the right to alter technical specification Sous r serve de modifications techniques Technische wijzigingen voorbehouden Option Puffer Options disponibles p...

Страница 16: ...3 2013 Page 16 19 Technische nderungen vorbehalten We reserve the right to alter technical specification Sous r serve de modifications techniques Technische wijzigingen voorbehouden Rahmen AX Cadre AX...

Страница 17: ...serve de modifications techniques Technische wijzigingen voorbehouden Rahmen BX Cadre BX Frame BX Raamwerk BX DE Vorabrahmen Novoferm GB Pre install frame Novoferm FR Pr carde Novoferm NL Putomranding...

Страница 18: ...DX Fl 60 x 5 90 DE Betonierh he 100 160mm GB height of concrete FR paisseur de b ton NL Betono verhevenheid kein Lieferumfang DE Not included in the delivery GB Non inclus dans la livraison FR Leveri...

Страница 19: ...013 Page 19 19 Technische nderungen vorbehalten We reserve the right to alter technical specification Sous r serve de modifications techniques Technische wijzigingen voorbehouden Rahmen EX Cadre EX Fr...

Отзывы: