background image

12 

3.3  Electrical connections 

Electrical connections 

Check that,  

  the voltage/phase supply corresponds to the information indicated on the motor plate. 

  Available power supply must have ground connection in conformity with safety regulations. 

  The connecting cables should have at least a 2.5mm

2

-section per phase. 

3.4  Water cooling system 

Fill  the  water  pan  with  clean  water  to  approximately  2cm  from  top  (ensure  that  bottom  of  pump  is 

fully immersed in water). Use the pump switch so you can use the pump. 
Open water-tap at blade guard (note that handle on water-tap should be in line with water-flow). 
Ensure  that  water  is  flowing  freely  in  the  circuit  and  is  delivered  adequately  to  both  sides  of  the 
blade, as insufficient water supply may result in premature failure of the diamond blade.  
The water pump must never run without water. Always make sure that there is enough water in the 

pan and refill if necessary. 
In case of frost, empty the water cooling system from its water. 

4  Transport and storing 

4.1  Securing for transport 

Before transporting or lifting the machine, always remove the blade and empty the water pan. You 
can transport the machine mounted, or you can remove some parts from the machine so it is lighter.  

 

 

Picture 2 : Securing the conveyor cart 

Picture 3 : Securing the water pan 

a)  If  you  want  to  transport  the  machine  mounted,  you  have  to  secure  the  conveyor  cart  and  the 
water pan:  

  To secure the cart (picture 2), loosen the wing nut (1) and turn the blocking device until it takes 

the screw (3). Then retighten the wing nut.  

  To secure the water pan (picture 3), make sure the blocking device (1) is in the shown position. 

b) You can also remove the conveyor cart and the water pan:  

  To remove the cart, loosen the wing nut (1 on picture 2) and turn the blocking device until  it is 

parallel to the scale.  Loosen the knobs on each side of the conveyor cart (1 on picture 4), and 

put the anti-tipping device in its lower position. Then remove the cart.  

  Before removing the pan, take the water pump out of it. Open the blocking device (1 on picture 

3) and pull the pan out of the profiles.  

Содержание clipper CHW Series

Страница 1: ...CHW OPERATING INSTRUCTIONS...

Страница 2: ...2...

Страница 3: ...230V Code 70184614040 70184614039 is in conformity with the following Directives European Machinery Directive 2006 42 EC LOW VOLTAGE 2006 95 EC Electromagnetic Compatibility Directive 2004 108 EC and...

Страница 4: ...4...

Страница 5: ...ommissioning 11 3 1 Head locking 11 3 2 Tool assembly 11 3 3 Electrical connections 12 3 4 Water cooling system 12 4 Transport and storing 12 4 1 Securing for transport 12 4 2 Transport procedure 13 4...

Страница 6: ...bserving the operating instructions and compliance with inspection and servicing requirements shall also be considered as included under use in accordance with the regulations 1 1 Symbols Important wa...

Страница 7: ...specified Processes No 8 of the Protection of Eyes Regulation 1974 Regulation 2 2 Part 1 For security reasons never leave the machine unattended untied or unlocked Electrical powered machine Always t...

Страница 8: ...will immediately appreciate the attention given to detail and quality of materials used in construction The machine and its component parts are assembled to high standards assuring long life and mini...

Страница 9: ...smooth movement The conveyor cart is equipped with graduated scale on the backstop and with a guide a cut device Water cooling system 7 The coolant system comprises A powerful submersible electric wa...

Страница 10: ...nd pressure level 80 dB A ISO EN 11201 Sound energy level 92 dB A ISO EN 3744 70184610052 70184614039 70184614077 CHW500 Cutting length mm 500 mm Table dimension 500x500 mm Machine dimensions 1130x705...

Страница 11: ...imum permitted rotation speed Before mounting a new blade into the machine switch off the machine and isolate it from the main source of electricity To mount a new blade follow these steps Open the ou...

Страница 12: ...he water cooling system from its water 4 Transport and storing 4 1 Securing for transport Before transporting or lifting the machine always remove the blade and empty the water pan You can transport t...

Страница 13: ...5 1 1 Siting the machine Remove from the site anything which might hinder the working procedure Make sure the site is sufficiently well lit Observe manufacturer s conditions for connecting to power su...

Страница 14: ...e material e g make 2 or 3 shallow cuts 5 2 2 Multiple step cutting Multiple step cutting consists of moving the conveyor cart with the material to be cut back and forward under the rotating blade Pla...

Страница 15: ...k make sure tools are firmly seated Before using the machine make sure the two anti tipping devices are tighten correctly Loosen the knob 1 on picture 6 and tighten the anti tipping device 2 so the sh...

Страница 16: ...Always perform the maintenance of the motor with the machine isolated from the electrical supply Lubrication The CHW uses life lubricated bearings Therefore you don t need to lubricate the machine at...

Страница 17: ...ed by qualified electrician Motor is not running Defective motor Change motor or contact motor manufacturer Cutting advance too quick Cut slowly Blade is blunt or glazed Sharpen the blade in calcareou...

Страница 18: ...18 7 3 Circuit diagram 230V Motor...

Страница 19: ...19 115V Motor...

Страница 20: ...ch is not always the quickest way Clear instructions will avoid problems and faulty deliveries If not sure please send us the defective part In the case of a warranty claim the part must always be ret...

Страница 21: ...ts GmbH Birkenweg 45 49 D 50389 WESSELING Tel 02236 8911 0 Fax 02236 8911 30 e mail sales ngg saint gobain com Spain Saint Gobain Abrasivos S A Ctra Guipuzcoa km7 5 E 31195 BERRIOPLANO Navarra Tel 003...

Страница 22: ...22...

Страница 23: ...23 SAINT GOBAIN ABRASIVES 190 Bd J F Kennedy L 4930 BASCHARAGE LUXEMBOURG Tel 352 50401 1 Fax 352 501633 e mail sales nlx saint gobain com www construction norton eu 06 11 2008...

Отзывы: