Doc. No:
D000100-INS-03, Rev D
Page 4 of 36
1
I
NTRODUCTION
This document describes maintenance routines to follow when operating
the SiteStar Cabinet, an outdoor battery backup system.
1.1
T
ARGET
G
ROUP
The target group for this document is the personnel involved in the
maintenance of the site.
1.2
D
OCUMENTS
The following documents are available to provide detailed information on
the SiteStar Cabinet and its handling:
D000100/1, SiteStar Cabinet Description
D000100/2, SiteStar Cabinet Installation
D000100/4, SiteStar Spare Parts
1.3
I
LLUSTRATIONS
Illustrations in this document can show alternative designs.
1.4
P
REREQUISITES
All performance statement in this document relies on the following:
Only approved hardware are used
Proper hardware handling
Maintenance instructions as well as documentation for external
equipment are followed
1.5
A
BBREVIATIONS
Abbreviations used in this document.
AC
Alternating Current
CB
Circuit Breaker
CCU
Climate Control Unit
CLU
Climate Unit
DC
Direct Current