Northern Lights Lugger M944W Скачать руководство пользователя страница 6

6

Take the pre-assembled enclosure top (Items 3, 4, 5, 7, 8, 16, 17, 18, 19 and 22) 

and note the available leg on each of the cast corners (Item 7).  Install a bolting 

assembly (Item 8) to each of these legs.  See Figure 2.

Figure 2: 

 Internal view of corner casting, 

part of the pre-assembled top enclosure 

frame assembly.

Note arrangement of bolting assembly.

4

Figure 3:

  Note how the bolting assembly 

fits inside the vertical extrusion.  Only finger 

tighten until all four corners have been fully 

installed.

Make sure that you have the end with the triangular shaped penetration plate 

(item 18) at the forward left hand corner of the genset. Then take the enclosure 

top assembly and position it so that the legs are facing down and install each 

of the legs into the top of each vertical extrusion. You may wish to temporarily 

remove the top panel assemblies (items 16 & 17) and set them aside for now to 

help improve visual and manual access to the bolting assemblies and for step 8.  

See Figure 3.

7

Содержание Lugger M944W

Страница 1: ...419 W Newport Center Dr Deerfield Beach FL 33442 Tel 954 421 1717 Fax 954 421 1712 Alaska Branch Office 1200 West International Airport Road Anchorage AK 99519 Tel 907 562 2222 Fax 907 563 1921 East C...

Страница 2: ...L695 05 1...

Страница 3: ...nel aft assembly 05 75408 1 14 RH side panel forward assembly 05 71207 1 no vent box 15 RH side panel aft assembly 05 75411 1 16 Top panel forward assembly 05 71217 1 17 Top panel aft assembly 05 7540...

Страница 4: ...r the center of the board as a template to drill your base mounting bolt holes into your floor or deck Place the generator set onto the baseboard lining up the thru holes with the mounting holes in th...

Страница 5: ...ll the lock washer and hex nut Insert one end of the extrusion into the bolting assembly Item 8 making sure that the square head goes inside the extrusion recess See Figure 1B Figure 1A Toe bracket sh...

Страница 6: ...s inside the vertical extrusion Only finger tighten until all four corners have been fully installed Make sure that you have the end with the triangular shaped penetration plate item 18 at the forward...

Страница 7: ...to lower left hand side of generator when rear panel is fully installed just push the open end of this hose into the hole as shown in the diagram Once all four corners of the enclosure top frame assem...

Страница 8: ...e sea water pump inlet fitting c Connect the vessel s fuel supply and fuel return to the generator set using Coast Guard approved rubber fuel hoses Pass these lines through the hole provided at the bo...

Страница 9: ...ion as follows a Disconnect the hose from the seawater output and from the rubber elbow from the expansion tank Install two lengths of 3 4 hose The hose from the expansion tank must go through the hol...

Страница 10: ...adjust for this by loosening any number of corner bolting as semblies until fit is satisfactory Tighten all connections when done Occasionally one or more of the panel latches may need a minor adjust...

Страница 11: ...led 8 Bolting assembly 00 75714 10 installed 18 Penetration panel assembly 39 78008 1 installed 19 Panel retainer bracket 30R 23 70036 2 installed 22 Hex nut nylock 1 4 20 14 00112 4 installed 16 Top...

Страница 12: ...IONS CONSIST OF TWO LAYERS OF SOUND FOAM TWO PLUGS MAY BE PRESENT AND MUST BE REMOVED BEFORE PANEL INSTALLATION SHOWN BELOW IS THE INTERIOR VIEW OF A TYPICAL SOUND SHIELD REAR PANEL APPEARANCE MAY VAR...

Отзывы: