22
Close the valve on the charging cylinder and discharge the refrigerant by loosening the flare nut on the
2-
way valve approximately 45’ until the gauge indicates 0.3 to 0.5 Mpa.
6). Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the open
position
Be sure to use a hexagonal wrench to operate the valve stems.
7). Mount the valve stems nuts and the service port cap
Be sure to use a torque wrench to tighten the service port cap to a torque 18N.m.
Be sure to check the gas leakage.
6.7 Re-installation while the outdoor unit need to be repaired
1. Evacuation for
the whole system
Procedure:
1).
Confirm that both the 2-way and 3-way valves are set to the opened position.
2). Connect the vacuum pump to 3-way valve
’s service port.
3). Evacuation for approximately one hour. Confirm that the compound meter indicates -0.1Mpa.
4). Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the vacuum pump.
Содержание MSC-28CRDN1-MN15W
Страница 10: ...8 For MSC 28CRDN1 MN15W and MSC 36CRDN1 MN5W models ...
Страница 14: ...12 5 Wiring Diagram 5 1 Indoor Unit MSC 28CRDN1 MN15W MSC 30HRDN1 MP0W MSC 36CRDN1 MN5W MSC 36HRDN1 MN5W ...
Страница 15: ...13 5 2 Outdoor Unit MOG 28CDN1 MN15W MOG 30HDN1 MP0W MOJ 36CDN1 MN5W MOJ 36HDN1 MN5W ...
Страница 26: ...24 Use torque wrench to tighten the service port cap to a torque of 18N m Be sure to check for gas leakage ...