Set the power supply card amd Ring Generator (if installed) to
ON (up). The green LED on the card should light and stay lit.
At the MAP terminal
15
Return the IPE to service by typing the following string:
>RTS PM
and pressing the Enter key.
16
If replacing an NT7D07BA or spare, verify current load in IPE by
typing the following string:
>QueryPM
and pressing the Enter key.
Make sure “load within IPE” matches “loadnames” PMload.
17
If replacing an NT7D07BA or spare, using the system
management tool Optivity Telephony Manager for MSL-100,
verify the bootable flashload in the IPE matches table IPEINV.
Specify the current IPE and open the IPE load utility.
Verify the bootable load matches table IPEINV.
18
If replacing an NT7D07BA or spare, if no bootable load exists in
the IPE, download the current software load from the SLM to the
IPE using OTM.
19
Send any faulty cards for repair according to local procedure.
20
Record the following items in office records:
•
date the card was replaced
•
serial number of the card
•
symptoms that prompted replacement of the card
21
You have completed this procedure. After you have used the
Optivity Telephony Manager for Meridian SL-100 to download
firmware to the EXPEC controller card, go to the MAP, man busy
the card, and return to service (RTS) the card in order for the
new firmware load to take effect.
22
Return to the maintenance procedure that directed you to this
card replacement procedure and continue as directed.
Содержание Meridian SL-100 SE
Страница 2: ......
Страница 4: ......
Страница 6: ...vi Publication history 555 4031 547 Standard 12 02 July 2002...
Страница 10: ...x Contents 555 4031 547 Standard 12 02 July 2002...
Страница 46: ...46 FSP card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 56: ...56 FSP card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 72: ...72 FSP card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 80: ...80 IPE card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 96: ...96 IPE card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 108: ...108 IPE card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 120: ...120 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 138: ...138 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 149: ...149 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 150: ...150 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 160: ...160 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 187: ...187 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 188: ...188 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 198: ...198 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 208: ...208 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 218: ...218 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 228: ...228 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 252: ...252 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 294: ...294 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 320: ...320 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 322: ...322 MCRM S card replacement procedures 555 4031 547 Standard 12 02 July 2002...
Страница 337: ......