Chapter 2 Cabling the gateway and turning the power on
33
Installing the Contivity 1700
Verifying a successful installation
After you connect the gateway to the power outlet and turn it on, you can verify a
successful installation by checking the LEDs on the front panel
(Figure 8)
.
The following sequence of LEDs should occur:
1
The power LED (the Nortel Networks logo) lights blue.
2
As the gateway boots, the Boot/Ready LED lights yellow.
3
When the boot process completes successfully, the Boot/Ready LED lights
green, indicating that the gateway is operational.
4
The Alert/Fail LED lights yellow because the gateway is not configured.
For a newly installed Contivity 1700, a yellow Alert/Fail LED does not
indicate an alarm condition. After you configure the management IP address
on the gateway, the Alert/Fail LED turns off. (See
Chapter 3, “Configuring the
management IP interface,” on page 43
.)
If the LEDs on the front panel light in this sequence, your installation is
successful. If the LEDs do not light in this sequence, check that the bezel is on the
gateway and that the power cord is properly attached to the power supply (see
“Connecting the power cord” on page 32
).
If the Contivity 1700 still does not boot, contact your local Nortel Networks
Technical Solutions Center (see
“How to get help” on page 18
).
Содержание 1700
Страница 6: ...6 314711 D Rev 00 ...
Страница 10: ...10 Contents 314711 D Rev 00 ...
Страница 14: ...14 Tables 314711 D Rev 00 ...
Страница 28: ...28 Chapter 1 Installing the Contivity 1700 chassis 314711 D Rev 00 ...
Страница 42: ...42 Chapter 2 Cabling the gateway and turning the power on 314711 D Rev 00 ...
Страница 50: ...50 Chapter 3 Configuring the management IP interface 314711 D Rev 00 Figure 16 Welcome screen ...
Страница 52: ...52 Chapter 3 Configuring the management IP interface 314711 D Rev 00 ...
Страница 88: ...88 Appendix A Technical specifications 314711 D Rev 00 ...
Страница 94: ...94 Index 314711 D Rev 00 ...