![Norstar DR5 Скачать руководство пользователя страница 208](http://html1.mh-extra.com/html/norstar/dr5/dr5_installers-manual_1705695208.webp)
202 installation check
Installation check
It is important to establish that both your
system and your
hardware are operating normally. To be sure of this, follow the
procedures in this chapter.
Testing the
system
Verify
system functions and programming options by
working through the user cards for
telephones and
optional equipment, as described in the following procedures.
Test the
telephone operations
1. Make and receive calls.
2. Make notes on any problems.
3. Check calls that have been put on hold.
Check the programmable buttons
Use the following feature code to check what is programmed on
the programmable buttons:
Button Inquiry code
Test Line and Telephone programming,
You can use the Line and Telephone profile inquiry features
to
verify the programming applied to a specific line or telephone.
Refer to the Programming chapter in this Installer Guide for a
description of how the Line and Telephone profile features
operate.
Modular
Installer Guide
Содержание DR5
Страница 1: ...ttttttttttttttttttttttttttttttttttttttttt Modular DR5 Installer Guide http stores ebay com UsefulCDs ...
Страница 2: ......
Страница 45: ...Module installation 39 Installing the cable troughs Modular DR5 Installer Guide ...
Страница 76: ...70 Telephone relocation and replacement Modular DR5 Installer Guide ...
Страница 164: ...158 Set Copy ...
Страница 244: ...238 Problems with optional equipment Modular DR5 Installer Guide ...
Страница 266: ...260 Glossary Modular DR5 Installer Guide ...
Страница 278: ...nofslar l o o o o o o o o o o o o o o o o o o o o o o o o a o o o o a o o a Modular OR5 System Coordinator Guide ...
Страница 294: ...12 Call Display services Modular DR5 System Coordinator Guide ...
Страница 516: ...234 Glossary Modular DR5 System Coordinator Guide ...
Страница 526: ...244 Index Modular DR5 System Coordinator Guide ...
Страница 529: ... I J I I I I I I ...