NORIS Automation GmbH
Commissioning | 5
Instruction manual FA13
37 / 44
Commissioning
Preparing tools and resources
Have the following tools and equipment ready for commissioning:
▪ Multimeter
▪ 2-channel oscilloscope
▪ 10 kΩ load resistor
Make sure that the tools and equipment are in perfect working
order.
Otherwise the results of the measurements described below may be
falsified.
Checking the operating voltage
You require the following tools and equipment:
▪ Multimeter
Check that the operating voltage U
nominal
corresponds to the
specification:
5:
Checking operating voltage
A. Switch to the measuring range for direct voltage.
B. Connect multimeter [+] to sensor [+] and multimeter [-] to sensor [-].
C. Switch on the operating voltage.
➨
Result:
The multimeter shows U
nominal
.
➨
Avoid reverse polarity.
5
5.1
NOTICE
5.2