background image

9

Alternate Method of Providing

Air from Outside:

If acceptable under local Codes, it is permitted to provide 
outside air using one opening (See NFGC).

 

Generally, 

confi ned spaces must have two openings in the space 
for combustion air. One opening must be within 12 
inches of the ceiling, and the other must be within 12 
inches of the fl oor. However, an alternative method 
recently adopted by the NFGC uses one opening within 
12 inches of the top of the space. This method may be 
used if it is acceptable to the local codes.

The following conditions must be met:

1. The opening must start within 12” of the top of the 

structure and connect with the out of doors through 
vertical or horizontal ducts or be ducted to a crawl 
or attic space that connects with the out of doors.

2. The opening must have a minimum free area of 1 sq. 

in. per 3,000 Btu per hour of the total input rating of 
all equipment located in the enclosure.

3. The free area must not be less than the sum of all 

the areas of the vent connectors in the enclosure.

Example

:

A space with a water heater rated at 45,000 Btuh 
input and a furnace rated at 75,000 Btuh requires a 
volume of 6,000 cubic feet [50 x (45 + 75) = 6,000] to 
be considered unconfi ned. If the space has an 8 foot 
ceiling, the fl oor area of the space must be 750 square 
feet (6,000 / 8 = 750).

Installation In An Unconfi ned Space

An unconfi ned space is an area including all rooms not 
separated by doors with a volume greater than 50 cubic 
feet per 1,000 Btuh of the combined input rates of all 
appliances which draw combustion air from that space.

In general, a furnace installed in an unconfi ned space will 
not require outside air for combustion. However, in homes 
built for energy effi ciency (low air change rates), it may 
be necessary to provide outside air to ensure adequate 
combustion and venting, even though the furnace is located 
in an unconfi ned space. See example.

Category I Venting

This furnace is listed as a Category I vented appliance. 
Category I furnaces generally operate with a slight 
negative pressure (draft) and must be vented vertically or 
near vertical. Additionally it is important to guard against 
excessive condensation.

 WARNING:

Upon completion of the furnace installation, 
carefully inspect the entire fl ue system both 
inside and outside the furnace to assure it is 
properly sealed. Leaks in the fl ue system can 
result in serious personal injury or death due 
to exposure of fl ue products, including carbon 
monoxide.

•  This furnace must be vented in compliance with 

the current revision of the National Fuel Gas Code 
(ANSI-Z223.1/NFPA54) and the instructions provided 
below. 

Consult local codes for special requirements.

•  In Canada, venting shall conform to the requirements of 

the current (CAN/CGA B149.1 or .2) installation codes. 

Consult local codes for special requirements.

•  Category I furnace installations must be connected 

to a factory built chimney or vent complying with a 
recognized standard, or a masonry or concrete chimney 
lined with a lining material acceptable to the authority 
having jurisdiction.

 WARNING:

Venting into an unlined masonry chimney or 
concrete chimney is prohibited. This may result 
in improper draft and excess condensation 
forming in the chimney.

•  This furnace may be vented with a dedicated venting 

system or common vented with other Category I 
appliances. The vent system dimensions and material 
must conform to the NFGC or local Codes. Generally, 
this means using Type B vent pipe or a lined masonry 
chimney. When consulting the vent sizing tables in the 
NFGC, the MAX capacity of the vent must be greater 
than the furnaces high fi re rate. The MIN capacity must 
be lower than the low fi re rate. If the venting system 
is inappropriate for the furnace, the venting system 
will need to be modifi ed to comply with NFGC or local 
codes. 

The minimum diameter of any vent pipe is 4 

inches.

•  The venting system should be designed to have the 

minimum number of elbows or turns. All horizontal runs 
shall slope upwards from the furnace at ¼ inch per 
running foot of vent. Supports for the vent pipe must 
be installed a minimum of every fi ve feet along the vent 
run to ensure no displacement after installation. Under 
no circumstances shall any portion of the vent system 

Содержание *SA Upfl ow / Horizontal

Страница 1: ...upplier s instructions If you cannot reach your gas supplier call the fire department WARNING RISQUE D INCENDIE OU D EXPLOSION Le non respect des avertissements de s curit pourrait entra ner des bless...

Страница 2: ...r Connections 11 Upflow Horizontal Furnaces 11 Side Return Installations 11 Bottom Return Installations 12 Downflow Furnaces 12 Acoustical Treatments 12 FURNACE INSTALLATION 12 General Requirements 12...

Страница 3: ...ry or death This furnace must be installed in accordance with these instructions all applicable local building codes and the current revision of the National Fuel Gas Code NFPA54 ANSI Z223 1 or the Na...

Страница 4: ...ermostat The installation must include a properly installed filter in the return air system with no by pass air The filter must be inspected frequently and replaced when necessary Combustion air must...

Страница 5: ...opane Installation Codes NSCNGPIC Venting Systems and Air Supply for Appliances Duct Systems US and CANADA Air Conditioning Contractors Association ACCA Manual D Sheet Metal and Air Conditioning Contr...

Страница 6: ...n vacuent correctement tel que prescrit ci dessus rouvrir les portes et les fen tres et remettre les ventilateurs d vacuation les registres de foyers et tout autre appareil fonctionnant au gaz leur ta...

Страница 7: ...air from that space Furnaceclosets smallequipmentroomsandgaragesare confined spaces Furnaces installed in a confined space which supply heated air to areas outside the space must draw return air from...

Страница 8: ...or Wall 12 Max 12 Max Furnace NOTE Each opening to outside must be at least 1 sq in per 4 000 Btuh of total input rating Vent or Chimney Water Heater See Note Total Input Rating Btuh Minimum Free Area...

Страница 9: ...ve pressure draft and must be vented vertically or near vertical Additionally it is important to guard against excessive condensation WARNING Upon completion of the furnace installation carefully insp...

Страница 10: ...xisting vent system should also be checked to make sure it remains in compliance with NFGC If it isn t the vent system must be brought into compliance before installing the furnace Horizontal Venting...

Страница 11: ...e furnace is equal to the return air supply under normal indoor return air applications When a cooling system is installed which uses the furnace blower to provide airflow over the indoor coil the coi...

Страница 12: ...ur knockouts to expose the blower assembly Position the return air duct over the opening in the side and secure together with sheet metal screws The screws must penetrate the duct and furnace casing W...

Страница 13: ...hers Securethesupportframetothe rafters with lag bolts The furnace can also be suspended using steel straps around each end of the furnace The straps should be attached to the furnace with sheet metal...

Страница 14: ...e the furnace in reverse order Bottom Panel Removal The steps listed below describe how to remove the bottom panel from the furnace See Figure 11 1 Remove the door 1 from the blower compartment 2 Disc...

Страница 15: ...IPING FIRE OR EXPLOSION HAZARD Failure to follow safety warnings exactly could result in serious injury or property damage Installation and service must be performed by a qualified installer service a...

Страница 16: ...2 000 feet the input needs to be reduced 8 at 3 000 feet 12 etc This deration is in reference to the input rate and gas heating value at sea level Toderatethefurnacerequiresknowingtheheatingvalueof t...

Страница 17: ...TATUS FLAME 180 COOL HEAT 120 90 60 BLOWER OFF DELAY LOW ML MH HIGH EAC L1 XFMR HUM 24V L1A 5 NEUTRALS 2 6 3 4 1 7 8 9 5 2 6 3 4 1 FAN 8 3 5 See Note R C Y G W STATUS FLAME 180 COOL HEAT 120 90 60 BLO...

Страница 18: ...erty damage Before servicing disconnect all electrical power to furnace When servicing controls label all wires prior to disconnecting Reconnect wires correctly Verify proper operation after servicing...

Страница 19: ...is connected Furnace Model SA SK Furnace Input Btuh Cabinet Width in Nominal Electrical Supply Maximum Operating Voltage Minimum Operating Voltage Maximum Furnace Amperes Minimum Wire Gauge Maximum F...

Страница 20: ...municate to a fixed speed or variable speed high efficiency motor that may be optionally installed Please contact your distributor for the proper upgrade motor kit Heat Anticipator Set the heat antici...

Страница 21: ...cal power to the furnace 3 FollowtheOperatingInstructionsonthelabelattached to the furnace 4 Setthethermostataboveroomtemperatureandverify the Operating Sequence Page 22 5 After 5 minutes of operation...

Страница 22: ...t switch should turn off the gas valve when the return is blocked time depends on how well the return air is blocked The circulating air and combustion blowers should continue to run when the limit sw...

Страница 23: ...will close the gas valve and initiate the shutdown cycle GasValve Controls the flow of gas to the burners When the gas valve is energized it automatically opens and regulates the gas pressure in the...

Страница 24: ...urnace 4 Turn the gas control switch to the OFF position 5 Disconnect the wires from the gas valve igniter flame sensor and flame rollout switch CAUTION To prevent damage to the unit or internal compo...

Страница 25: ...ays however the flue vent system and burners should be inspected and cleaned if required by a qualified service technician annually to ensure continued safe operation Pay attention to any deterioratio...

Страница 26: ...23A 072C 24B 17 1 2 11 3 4 15 7 8 16 1 8 090C 24B 072C 35C 21 14 19 3 8 19 7 8 090C 35C 108C 35C 126C 45D 24 1 2 15 1 4 22 7 8 23 1 8 NOTE Dimensions shown in Inches 18 5 8 C 7 34 1 2 22 1 2 28 25 3 8...

Страница 27: ...685 32 1 645 32 1 590 34 1 550 34 1 485 36 1 415 38 Med High 1 400 38 1 360 39 1 340 40 1 310 41 1 275 42 1 245 43 1 190 45 1 125 47 Med Low 1 235 43 1 215 44 1 180 45 1 155 46 1 130 47 1 100 48 1 060...

Страница 28: ...63 1 225 65 1 175 68 SA108C 35C Side Return 108 000 High 2 295 35 2 235 36 2 180 37 2 110 38 2 050 39 1 975 41 1 900 42 1 810 44 Med High 2 130 38 2 075 39 2 035 39 1 970 41 1 915 42 1 845 43 1 765 4...

Страница 29: ...51 1 300 51 1 280 52 1 255 53 1 230 54 1 200 56 1 150 58 Med Low 1 180 56 1 165 57 1 150 58 1 135 59 1 115 60 1 090 61 1 060 63 1 010 66 Low 940 71 925 72 900 74 880 76 850 78 825 81 795 84 760 88 SK...

Страница 30: ...n Yellow LED Continuous Flash On Alternating Flash IGNITOR INDUCER FLAME SENSOR C BLOWER LIMIT SWITCH DOOR SWITCH R 4 SPEED MOTOR WHITE RED BLUE ORANGE BLACK BLOWER LIMIT SWITCH GAS VALVE H MH ML L C...

Страница 31: ...ER REVOLUTION OF GAS METER 1 5 10 10 360 1 800 3 600 12 300 1 500 3 000 14 257 1 286 2 571 16 225 1 125 2 250 18 200 1 000 2 000 20 180 900 1 800 22 164 818 1 636 24 150 750 1 500 26 138 692 1 385 28...

Страница 32: ...57 57 ORIFICE SIZE 9 0 9 0 9 0 9 0 9 0 9 0 MANIFOLD PRESSURE 8 000 to 10 000 FT 59 57 57 57 57 57 ORIFICE SIZE 8 5 8 5 8 5 8 5 8 5 8 5 MANIFOLD PRESSURE LOCAL HEATING VALUES FOR NATURAL GAS ALTITUDE...

Страница 33: ...LD PRESSURE 9 000 to 9 999 FT 51 49 49 49 49 49 ORIFICE SIZE 2 6 2 8 2 8 2 8 2 8 2 8 MANIFOLD PRESSURE Table 11 High Altitude Deration Chart for Natural Gas Low Heating Value NATURAL GAS with LOW HEAT...

Страница 34: ...oll Out Switch Transformer Blower Assembly Control Board Main Air Limit Switch Figure 20 Furnace Components Combustion Tube Gas Manifold Gas Valve Inducer Assembly Control Board Pressure Switch Transf...

Страница 35: ...35...

Страница 36: ...tion of this appliance Some local codes require licensed installation service personnel for this type of equipment Please read all instructions carefully before starting the installation Return these...

Отзывы: