background image

151B0801 R5 3/28/2006

 

5

Fig. 2: Common Chimney Problems 

 

 

Table 2: Common Chimney Problems 
 

Refer to Figure 2 

Key Trouble  Diagnostic  Remedy 

Top of chimney 
lower than 
surrounding 
objects 

Observation 

Extend chimney 
above all 
surrounding 
objects within 
30 feet. 

Chimney Cap 
or ventilator. 

Observation Remove 

Coping restricts 
opening. 

Observation 

Make opening 
as large as 
inside of 
chimney. 

 

Obstruction in 
chimney  
 
 

Can be found 
by light and 
mirror reflecting 
conditions in 
chimney. 

Use weight to 
break and 
dislodge. 

Joist protruding 
into chimney. 

Lowering a light 
on an extension 
cord. 

Must be 
handled by 
competent 
masonry 
contractor. 

Break in 
chimney lining. 

Smoke test - 
build smudge 
fire blocking off 
other opening, 
watching for 
smoke to 
escape. 

Must be 
handled by 
competent 
masonry 
contractor. 

Collection of 
soot at narrow 
space in flue 
opening. 

Lower light on 
extension cord. 

Clean out with 
weighted brush 
or bag of loose 
gravel on end 
of line. 

H Offset 

Lower light on 
extension cord. 

Change to 
straight or to 
long offset. 

Two or more 
openings to the 
same chimney. 

Found by 
inspection from 
basement. 

The least 
important 
opening must 
be closed, 
using some 
other chimney 
flue. 

Loose-seated 
pipe in flue 
opening. 

Smoke test. 

Cementing all 
pipe openings 
should 
eliminate leaks. 

Smoke pipe 
extends into 
chimney. 

Measurement 
of pipe from 
within or 
observation of 
pipe by means 
of a lowered 
light. 

Length of pipe 
must be 
reduced to 
allow end of 
pipe to be flush 
with inside of 
tile. 

Failure to 
extend the 
length of flue 
partition to the 
floor. 

By inspection or 
smoke test. 

Extend partition 
to floor level. 

Loose-fitted 
clean-out door. 

Smoke test. 

Close all leaks 
with cement. 

 
DRAFT REGULATOR CONTROL 

This device is used in conjunction with conventional chimney 
venting. This control (or draft regulator) automatically maintains 
a constant negative pressure in the furnace to obtain maximum 
efficiency. It ensures that proper pressures are not exceeded. If 
the chimney does not develop sufficient draft, the draft control 
cannot function properly. The draft regulator, must be installed 
within the same room or enclosure as the furnace, and should 

Содержание O4HD-091A-12-FA

Страница 1: ...WER ECM 8 FURNACE CONTROLS 9 OIL BURNER 9 FURNACE INSTALLATION SET UP 11 MAINTENANCE AND SERVICE 12 OPERATING INSTRUCTIONS 12 TABLE A 1 BECKETT OIL BURNER SET UP 13 TABLE A 2 DIRECT DRIVE BLOWER SET U...

Страница 2: ...f Oil Burning Equipment as well as in accordance with local codes In Canada the installation of the furnace and related equipment shall be installed in accordance with the regulations of CAN CSA B139...

Страница 3: ...able 1 Installation on a combustible floor requires a clearance of 1 inch Using a noncombustible material such as one inch thick channel iron or similar material can do this The furnace must be suppor...

Страница 4: ...VRV INCLUDED IN THIS KIT MUST BE USED IN CONJUNCTION WITH THE FURNACE BOOT CHIMNEY VENTING The chimney must be sized correctly and be in good repair If the chimney is oversized there is a high risk o...

Страница 5: ...on extension cord Change to straight or to long offset I Two or more openings to the same chimney Found by inspection from basement The least important opening must be closed using some other chimney...

Страница 6: ...urnace may be installed with a one pipe system with gravity feed or lift The maximum allowable lift on a single line system is 8 feet Lift should be measured from the bottom outlet of the tank to the...

Страница 7: ...tory is fed into pre programmed algorithms in the microprocessor to determine the correct motor output required to maintain constant airflow regardless of external static pressure The microprocessor a...

Страница 8: ...ng the dipswitch combination displayed in Table 5 This fan on delay can be set at 30 60 90 or 120 seconds This provides a delay between the burner ignition and blower start up to eliminate excessive f...

Страница 9: ...efficiency PREPARATIONS Drill a test port in the venting ideally at least 2 flue pipe diameters away from the furnace breeching if venting horizontally from the furnace or from the flue pipe elbow if...

Страница 10: ...s ducts the inside radius of elbows etc The supply air temperature should be measured at a point where the thermometer will be well within the air stream near the furnace supply air outlet Usually the...

Страница 11: ...tele spout oiler This oiler has a long flexible plastic spout DO NOT OVER LUBRICATE Excess oil may result in premature electric motor failure Inspect the blower fan Clean it if necessary Oil Burner Ma...

Страница 12: ...f air passing through the oil burner combustion chamber breeching etc up the chimney between burner cycles NOTE THE USE OF THIS CONTROL CAN OCCASIONALLY CAUSE POST COMBUSTION NOZZLE DRIP TABLE A 2 DIR...

Страница 13: ...w 1622 1602 1541 1499 1433 0 1 1 1215 1214 1214 1207 1204 1 0 0 1128 1108 1101 1095 1089 1 0 1 988 987 981 978 938 O4HD 091A V F 11 10 DD 9 6 50 80 F 0 0 0 788 787 781 777 756 1 1 0 1800 1800 1800 180...

Страница 14: ...ir Width A Depth B Height C D x E Side F x G Bottom Dia Height H Filter Perm Ship Weight lb O4HD 091A 22 31 50 1 2 20 1 2 x 20 14 x 22 14 x 22 5 42 16 x 25 x 1 190 O4HD 140A 22 31 58 1 8 20 1 2 x 20 1...

Страница 15: ...151B0801 R5 3 28 2006 15 APPENDIX A WIRING DIAGRAM O4HD 091A 12 FA and O4HD 140A 16 FA...

Страница 16: ...151B0801 R5 3 28 2006 16 APPENDIX B WIRING DIAGRAM O4HD 091A V F and O4HD 140A V F...

Страница 17: ...JURY PROPERTY DAMAGE OR DEATH ACCESSORIES The EFTB has provisions for supplying 115 volt power to an electronic air cleaner EAC as well as 115 volts to a line voltage humidifier or humidifier step dow...

Страница 18: ...park for 10 sec a Provides continuous spark after flame is sensed to assure that burner remains lit b Turns on LED diagnostic light c Starts carryover timer i Flame and call for heat are monitored If...

Страница 19: ...noid Valve LED Diagnostic Light RETURNS TO IDLE STATE FLAME FLAME FLAME FLAME NO FLAME NO FLAME FLAME LOST FLAME LOST REMAINS IN IDLE STATE R7184 SEQUENCE OF OPERATION LOCKOUT STATE R7184 Shuts off bu...

Страница 20: ...0 seconds b Burner motor is de energized Even though thermostat is still calling for heat c If circulator fan has started it continues through the selected heat fan off delay period Established flame...

Страница 21: ...t existing call for heat a Circulator fan turns off when heat fan off delay time is complete b Normal operation resumes electronic fan timer control is in standby mode awaiting next thermostat command...

Страница 22: ...shooting IMPORTANT Due to the potential hazard of line voltage only a trained experienced service technician should perform the troubleshooting procedure PRELIMINARY STEPS Check the diagnostic light f...

Страница 23: ...ce the R7184 control If the indicator light turns off replace cad cell bracket assembly Burner starts Trouble is in thermostat circuit Check thermostat wiring connections If connections are clean and...

Страница 24: ...Step 7 6 Reset oil primary control by pushing in and releasing red reset button Indicator light continues to flash at 1 Hz rate Verify that the control is not in restricted mode See notes at end of th...

Страница 25: ...each time a call for heat is successfully completed To reset from RESTRICTED MODE press and hold the reset button for 30 seconds When the LED flashes twice the device has reset NOTE Disable function P...

Страница 26: ...ht a maximum of 1500 in the presence of light Ensure that room light is not leaking into the cad cell compartment See diagnostic light section No fuel oil Check fuel oil supply Check that all hand ope...

Страница 27: ...r radiator Poor alignment between oil burner blast tube and fire pot Check alignment Blast tube should be centered with fire pot burner opening Oil burner head should be inch back from the inside surf...

Страница 28: ...re rise Slow down blower fan if necessary Supply air temperature too cool Excessive duct losses Check supply air ductwork Seal leaky joints and seams Insulate ductwork if necessary Fan control fan on...

Страница 29: ...151B0801 R5 3 28 2006 29 PARTS...

Страница 30: ...Filter 16 x 25 x 1 Permanent 2180023 23 Filter Frame End Support 5592B2 24 Junction Box 28723 25 Junction Box Cover 28722 26 Blower Assembly Complete Direct Drive 3 4 hp ECM O4HD 091A V F 30381 26a Bl...

Страница 31: ...unit 29161 20 Clean out Cover 2 per unit 29162 21 Filter Frame 16 x 25 x 1 18020 22 Filter Frame End Support 5592B2 23 Air Filter 16 x 25 x 1 Permanent 2180023 24 Junction Box 28723 25 Junction Box Co...

Страница 32: ...e Installed Contractor Contact Address Postal Code Telephone No After Hours No Service Contractor if different from Installation Contractor Service Tech Telephone No After Hours No Fuel Supplier Oil S...

Отзывы: