ProcessMate 6500 Temperature Control Unit
12
www.nordsonefd.com [email protected]
+1-401-431-7000 Sales and service of Nordson EFD dispensing systems are available worldwide.
Unpack the Unit
Use the checklist enclosed with the ProcessMate to identify all
items. If there is any discrepancy, please call us immediately.
1
Installation
2
Connect Power
a. Connect the power plug to the power pack. The unit
is shipped with a USA-compatible plug and three
international plugs. Attach the correct plug to match
local power outlets.
b. Connect the power cord into the back of the
ProcessMate.
c. Connect the power cord into your local power source.
3
Connect Air Input
NOTE:
Clean, dry, filtered factory air is required to meet the
warranty. If your air supply is not filtered, order the EFD five-
micron filter / regulator (part #7016547).
a. Push one end of the air input hose into the input fitting
on the back of the ProcessMate.
b. Connect the other end of the hose to your plant air
supply.
DO NOT exceed 7.5 bar (110 psi) or damage to the unit may
occur.
CAUTION
c. Set the plant air supply within 5.5–6.9 bar (80–100 psi).