
13
www.nordsonefd.com [email protected]
+1-401-431-7000 Sales and service of Nordson EFD dispensing systems are available worldwide.
ProcessMate 6500 Temperature Control Unit
Installation (continued)
4
Connect Thermocouple
a. Plug the K-type thermocouple lead into the back panel
of the ProcessMate.
b. Connect the other end of the lead to the process
hardware.
*Option: Route the thermocouple lead with either air line
tube inside the insulation. See directions below.
NOTE:
Longer thermocouple leads can be used when
required. These are available from a variety of sources in
many lengths. Only K-Type thermocouple leads should
be used with the ProcessMate. Using a different type will
result in incorrect temperatures.
5
Attach Process Feed Lines
a. Slide the insulation over the cold process feed line.
b. Slide the insulation over the hot process feed line.
*Option: Route the thermocouple lead with either the hot
or cold process feed line.
c. Insert the cold process feed line into the cold process
fitting.
d. Insert the hot process feed line into the hot process
fitting.
6
Connect Exhaust Mufflers
• Insert a muffler into each exhaust port for both cold and
hot feed exhausts.
NOTE:
Tubing can be purchased as an accessory to route
for remote exhaust in lieu of mufflers.