7
3. Orient the Upright (5) as shown. Have a
second person hold the Upright near the Main
Frame (1).
Locate the wire tie in the Upright (5). Tie the
lower end of the wire tie to the Wire Harness
(60). Next, pull the upper end of the wire tie
until the Wire Harness is routed through the
Upright. Then, untie and discard the wire tie.
Tip: To prevent the Wire Harness (60) from
falling into the Upright (5), secure the Wire
Harness with a rubber band or tape.
Tip: Avoid pinching the Wire Harness (60).
Insert the Upright (5) into the Main Frame (1).
Attach the Upright (5) with four M8 x 16mm
Patch Screws (102) and four M8 Split Washers
(103);
do not tighten the Patch Screws yet.
3
Wire Tie
Wire Tie
5
60
1
103
103
102
102
102
Avoid pinching
the Wire
Harness (60)
2. Orient the Front Stabilizer (3) so that the small
welded tubes are facing away from the Main
Frame (1).
Attach the Front Stabilizer (3) to the Main Frame
(1) with two M10 x 95mm Patch Screws (100).
2
Welded
Tubes
3
1
100
Содержание NTEL00909.4
Страница 25: ...25 NOTES...
Страница 26: ...26 NOTES...