8
STEP 3
I. Insert the Long shaft (56) to the Handlebar post (4), attach the Swing tube (7L/R) on the Long shaft (56) with
Allen bolt (26), Spring washer (25), Flat washer (59),D-shape washer (24) and Wave washer (21). Not to tighten till
now.
II.Fix the Pedal support (8L/R) on the Crank (20) with Allen bolt (26), Spring washer (25), Flat washer (59),
D-shape washer (24) and Wave washer (21). Not to tighten till now.
III. Connect the Swing tube (7L/R) and Pedal support (8L/R) together with the bolt (37), Flat washer (38), Flat
washer (30) and Nylon nut (31) as shown. And then lock the above mentioned Allen bolt (26), Bolt (37) and Nylon
nut (31) tightly.
IV. Lock the Pedal (34L/R) on the Pedal support (8L/R) tightly with Bolt (33), Flat washer (12) .
Содержание E480
Страница 18: ...18 EXPLODED DRAWING ...
Страница 19: ...19 EXPLODED DRAWING ...